# Datacenters: announced AI data center builds, full data > Generated from https://datacenters.fru.dev. One block per build, largest first. Figures as announced by the companies or reported by the sources linked; not investment advice. ## Project Matador https://datacenters.fru.dev/builds/fermi-project-matador | operator Fermi America | Amarillo, Texas | 11 GW (Planned 11 GW private power campus, possibly more than 17 GW; no binding tenant yet) | Building | target online Initial power targeted 2026 | partners siemens energy Fermi America is building a private power and AI data center campus in Carson County near Amarillo, Texas, planned at 11 GW or more. - Source (filing): https://www.sec.gov/Archives/edgar/data/2071778/000207177826000007/frmiex991fy2025shletter.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/2071778/000121390026078366/ea029807401ex99-1.htm ## Hyperion https://datacenters.fru.dev/builds/meta-hyperion | operator Meta | Richland Parish, Louisiana | 5 GW | Building | announced Dec 4, 2024 | target online 2030 | investment up to $50B | partners Entergy Meta's largest campus, phased through 2030; in July 2026 the plan grew to 5 GW and up to $50 billion. - 2026-07-13: capex 10 to 50 (https://www.datacenterdynamics.com/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/) - 2026-07-13: mw 2000 to 5000 (https://www.datacenterdynamics.com/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/) - Source (news): https://www.datacenterdynamics.com/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/ ## Nanto Campus, Toyama (unverified) https://datacenters.fru.dev/builds/gigastream-nanto | operator GigaStream Toyama | Nanto, Japan | 3.1 GW (3.1 GW planned; 400 MW first phase) | Announced | announced Dec 2025 | target online 2028 (first phase) | partners nanto city Nanto City and GigaStream Toyama plan a 3.1 GW data center hub, with a 400 MW first phase set for late 2028. - Source (news): https://www.techerati.com/news-hub/japan-plans-3-1-gw-data-centre-hub-in-nanto-city/ ## SoftBank AI data center campus, Hauts-de-France (Dunkirk, Bosquel, Bouchain) https://datacenters.fru.dev/builds/softbank-hauts-de-france | operator SoftBank Group | Dunkirk, France | 3.1 GW (3.1 GW first phase by 2031; up to 5 GW) | Announced | announced Jun 1, 2026 | target online 2031 | partners Schneider Electric, edf SoftBank plans an initial EUR 45 billion for 3.1 GW of AI data centers in Dunkirk, Bosquel and Bouchain by 2031. - Source (news): https://capacityglobal.com/news/softbank-ai-campus-drives-record-e93bn-investment-haul-at-choose-france-summit/ ## AirTrunk data center, Raigad (Pen Growth Centre) https://datacenters.fru.dev/builds/airtrunk-raigad | operator AirTrunk | Pen, India | 3 GW (3 GW) | Announced | announced Jun 1, 2026 | investment INR 2 lakh crore (about USD 21 billion); AirTrunk plans USD 30 billion and 5 GW in India by 2030 $21B | partners Blackstone Maharashtra gave AirTrunk a letter of intent for land at the Raigad Pen Growth Centre for a 3 GW, INR 2 lakh crore data center project. - Source (news): https://w.media/maharashtra-issues-letter-of-intent-to-airtrunk-for-%e2%82%b92-lakh-crore-data-center-project/ - Source (news): https://techcrunch.com/2026/06/05/airtrunk-commits-30b-to-build-5gw-of-ai-data-centers-in-india/ ## AWS Northern Indiana campuses https://datacenters.fru.dev/builds/aws-northern-indiana | operator AWS | Indiana | 2.4 GW (2.4 GW of data center capacity; NIPSCO to add up to 3 GW of generation) | Announced | announced Nov 24, 2025 | investment $15B, separate from the $11B St. Joseph County project $15B | partners nipsco Amazon plans $15 billion for new data center campuses in Northern Indiana adding 2.4 GW, on top of its St. Joseph County project. - Source (official): https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers ## Caldwell Valley Technology Park (unverified) https://datacenters.fru.dev/builds/tract-caldwell-valley | operator Tract | Lockhart, Texas | 2 GW (Over 2 GW at full build-out) | Announced | announced May 7, 2025 | target online Initial utility delivery first half of 2028 | partners bluebonnet electric Tract assembled a nearly 3,000 acre campus in Caldwell County, Texas, planned for over 2 GW of data centers from 2028. - Source (official): https://www.tract.com/news/tract-closes-acquisition-of-1515-acres-in-caldwell-county-texas-for-multi-gigawatt-data-center-technology-park/ ## Envision Galaxy Campus, Ulanqab https://datacenters.fru.dev/builds/envision-galaxy-ulanqab | operator Envision Energy | Ulanqab, China | 2 GW (2 GW; designed for one million AI accelerators) | Partly online | announced Jun 2026 Envision commissioned its 2 GW Galaxy AI campus in Ulanqab, Inner Mongolia, powered directly by renewable energy. - Source (news): https://w.media/envision-commissions-2-gw-ai-infrastructure-campus-in-inner-mongolia/ ## Sweetwater 1 and 2 https://datacenters.fru.dev/builds/iren-sweetwater | operator IREN | Sweetwater, Texas | 2 GW (Grid connection: Sweetwater 1 1,400 MW and Sweetwater 2 600 MW) | Building | target online Sweetwater 1 initial phase 2027 IREN 2 GW grid-connected site at Sweetwater, Texas; the first substation was energized in 2026 and initial AI capacity is planned for 2027. - Source (filing): https://www.sec.gov/Archives/edgar/data/1878848/000114036125024971/ef20051646_ex99-1.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/1878848/000187884826000025/irenreportsq3fy26results.htm ## Crusoe Wyoming (Project Jade) https://datacenters.fru.dev/builds/crusoe-wyoming-tallgrass | operator Crusoe | Cheyenne area, Wyoming | 1.8 GW (designed to scale to 10 GW) | Paused | announced Jul 2025 | partners Tallgrass A 1.8 GW campus planned with Tallgrass in southeast Wyoming, paused indefinitely in June 2026 at an unnamed customer's request. - 2026-06-09: status announced to paused (https://finance.yahoo.com/sectors/technology/articles/crusoe-pauses-wyoming-data-center-132126051.html) - Source (official): https://www.crusoe.ai/resources/newsroom/crusoe-and-tallgrass-announce-ai-data-center-in-wyoming - Source (news): https://finance.yahoo.com/sectors/technology/articles/crusoe-pauses-wyoming-data-center-132126051.html ## Fortune Data Center Park, near Hyderabad https://datacenters.fru.dev/builds/fortune-data-center-park-telangana | operator Fortune Hospitality & Infra | Hyderabad, India | 1.6 GW (1,200 to 1,600 MW across four 400 MW modules) | Announced | announced Sep 2026 | investment INR 600 billion (USD 6.2 billion) initially, up to INR 1 trillion (USD 10.4 billion) $6.2B Fortune Hospitality & Infra plans a 1.6 GW hyperscale data center park on 200 acres next to Bharat Future City near Hyderabad. - Source (news): https://w.media/fortune-hospitality-infra-plans-us-6-2-billion-hyperscale-data-center-park-in-telangana/ ## Rio AI City, Jacarepagua https://datacenters.fru.dev/builds/elea-rio-ai-city | operator Elea Data Centers | Rio de Janeiro, Brazil | 1.5 GW (1.5 GW, scalable to 3.5 GW) | Announced | announced Jun 8, 2026 Elea plans Rio AI City near Rio's Olympic Park, a 10-building campus of 1.5 GW scalable to 3.5 GW. - Source (news): https://www.dezeen.com/2026/06/08/rio-ai-city-hyphen-elea-latin-americas-largest-data-center/ ## YTL Power and JLand campus, Johor https://datacenters.fru.dev/builds/ytl-jland-johor | operator YTL Power International | Malaysia | 1.5 GW (1.3 GW to 1.5 GW (per MBSB Research)) | Announced | announced Aug 19, 2026 | partners jland group YTL Power and JLand plan a gigawatt-scale data center campus in Johor, estimated at 1.3 GW to 1.5 GW. - Source (news): https://w.media/ytl-power-and-jland-to-partner-to-build-up-to-1-5gw-data-center-in-johor/ ## Western Downs Digital Park (Anthropic) https://datacenters.fru.dev/builds/zerra-western-downs-digital-park | operator Zerra DC | tenant Anthropic | Dalby, Australia | 1.44 GW (Four 360 MW buildings, 1.44 GW IT and 2.16 GW peak draw) | Announced | announced Sep 2026 | target online 2027 (Anthropic start target) Anthropic will lease part of Zerra DC's planned 1.44 GW Western Downs Digital Park near Dalby, Queensland, for inference. - Source (news): https://capacityglobal.com/news/why-anthropic-went-straight-to-a-developer-for-its-first-australian-data-centre/ ## CDC Gregadoo campus, Wagga Wagga https://datacenters.fru.dev/builds/cdc-gregadoo-wagga | operator CDC Data Centres | Wagga Wagga, Australia | 1.4 GW (1.4 GW proposed) | Announced | announced Sep 16, 2026 | investment AUD 15 billion (about USD 10.5 billion) $11B CDC is seeking approval for a 1.4 GW sovereign compute campus at Gregadoo near Wagga Wagga, pitched at about AUD 15 billion. - Source (news): https://www.mingtiandi.com/real-estate/data-centres/cdc-proposes-10-5b-new-south-wales-data-centre/ ## MGX, Bpifrance, Mistral AI and Nvidia AI campus, Paris region https://datacenters.fru.dev/builds/mgx-bpifrance-mistral-nvidia-paris-campus | operator MGX | France | 1.4 GW (Expected to ultimately reach 1.4 GW) | Announced | announced May 19, 2025 | partners bpifrance, Mistral AI, Nvidia A joint venture of MGX, Bpifrance, Mistral AI and Nvidia plans Europe's largest AI campus in the Paris region, scaling to 1.4 GW. - Source (official): https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france ## Vantage Frontier campus https://datacenters.fru.dev/builds/vantage-frontier-shackelford | operator Vantage Data Centers | Shackelford County, Texas | 1.4 GW | Building | announced Aug 19, 2025 | target online H2 2026 | investment $25B Ten buildings on 1,200 acres, 1.4 GW of GPU capacity, first building due in the second half of 2026. OpenAI named Shackelford County for an Oracle-developed Stargate site a month later. - Source (official): https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/ - Source (official): https://openai.com/index/five-new-stargate-sites/ ## Monarch Compute Campus (unverified) https://datacenters.fru.dev/builds/nscale-monarch-wv | operator Nscale | tenant Microsoft | Point Pleasant, West Virginia | 1.35 GW (Letter of intent with Microsoft for up to 1.35 GW of AI compute; site power runway over 8 GW) | Announced | announced Mar 16, 2026 | chips NVIDIA Vera Rubin NVL72 | partners Nvidia, Caterpillar Nscale bought the Monarch campus in Mason County, West Virginia, and signed a letter of intent to host up to 1.35 GW of Vera Rubin GPUs for Microsoft. - Source (official): https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory ## Bell AI Fabric hub, Saskatchewan https://datacenters.fru.dev/builds/bell-ai-fabric-saskatchewan | operator Bell Canada | Canada | 1.2 GW (Up to 900 MW additional, toward a 1.2 GW hub) | Announced | announced Sep 2026 | partners government of saskatchewan Bell signed a non-binding MoU with Saskatchewan to add up to 900 MW of Bell AI Fabric capacity toward a 1.2 GW AI hub. - Source (news): https://w.media/bell-canada-plots-path-to-1-2-gw-canadian-ai-hub-in-saskatchewan/ ## Nebius Independence AI factory https://datacenters.fru.dev/builds/nebius-independence-mo | operator Nebius | Independence, Missouri | 1.2 GW (Up to 1.2 GW owned AI factory) | Building | target online Expected operational 2027 Nebius broke ground in May 2026 on an owned AI factory in Independence, Missouri, planned for up to 1.2 GW. - Source (filing): https://www.sec.gov/Archives/edgar/data/1513845/000110465926059872/tm2614392d1_ex99-2.htm ## Nebius Pennsylvania AI factory https://datacenters.fru.dev/builds/nebius-pennsylvania | operator Nebius | Pennsylvania | 1.2 GW (Power secured for up to 1.2 GW; exact site not named in the source) | Announced | announced May 13, 2026 | target online Phased from 2027 Nebius announced a second owned US gigawatt-scale site in Pennsylvania, with power secured for up to 1.2 GW, delivered in phases from 2027. - Source (filing): https://www.sec.gov/Archives/edgar/data/1513845/000110465926059872/tm2614392d1_ex99-2.htm ## SINES Data Campus (Start Campus) https://datacenters.fru.dev/builds/start-campus-sines | operator Start Campus | tenant Microsoft | Sines, Portugal | 1.2 GW (Fully permitted for 1.2 GW; Nscale adding a second 200 MW building for Microsoft) | Partly online | announced 2021 | target online 2030 | investment Microsoft announced USD 10 billion for AI infrastructure in Portugal with Nscale and Start Campus; Nscale adding EUR 230 million shared infrastructure and EUR 465 million for a second building $10B | chips 12,600+ Nvidia Blackwell Ultra GPUs plus 66,000+ Nvidia Rubin GPUs | partners Nscale, Nvidia Start Campus is building a 1.2 GW campus at a former coal plant in Sines, where Nscale deploys over 66,000 Nvidia Rubin GPUs for Microsoft. - Source (official): https://www.nscale.com/press-releases/nscale-start-campus - Source (news): https://constructiondigital.com/news/start-campus-coal-site-to-1-2-gw-data-campus-in-portugal - Source (news): https://w.media/microsoft-announces-10-billion-ai-infrastructure-investment-in-portugal/ ## Stargate Abilene https://datacenters.fru.dev/builds/stargate-abilene | operator Oracle | tenant OpenAI | Abilene, Texas | 1.2 GW | Partly online | announced Jan 21, 2025 | target online 2026 | chips NVIDIA GB200 | partners Crusoe, Lancium, Nvidia The flagship Stargate campus, built by Crusoe on Lancium's site and run by Oracle for OpenAI: eight buildings, about 1.2 GW. - 2026-03-06: mw 1800 to 1200 (https://www.datacenterdynamics.com/en/news/oracleopenai-drop-plans-to-expand-flagship-abilene-stargate-site-meta-in-talks-to-pick-up-crusoe-capacity-with-nvidias-help/) - 2025-09-23: mw 1200 to 1800 (https://openai.com/index/five-new-stargate-sites/) - 2025-09-23: status under construction to partly online (https://openai.com/index/five-new-stargate-sites/) - Source (official): https://openai.com/index/stargate-advances-with-partnership-with-oracle/ - Source (news): https://www.datacenterdynamics.com/en/news/oracleopenai-drop-plans-to-expand-flagship-abilene-stargate-site-meta-in-talks-to-pick-up-crusoe-capacity-with-nvidias-help/ ## Stargate Milam County (Freebird) https://datacenters.fru.dev/builds/stargate-milam-freebird | operator SB Energy | tenant OpenAI | Milam County, Texas | 1.2 GW | Building | announced Sep 23, 2025 | target online Oct 15, 2026 | partners SoftBank SB Energy builds and runs the 1.2 GW site; phase one, four data halls in 548,950 sq ft, is filed for completion on October 15, 2026. - 2026-04-22: target_online 2026 to 2026-10-15 (https://www.datacenterdynamics.com/en/news/openai-stargates-milam-texas-freebird-data-center-to-span-548950-sq-ft-in-first-phase/) - Source (official): https://openai.com/index/five-new-stargate-sites/ - Source (news): https://www.datacenterdynamics.com/en/news/openai-stargates-milam-texas-freebird-data-center-to-span-548950-sq-ft-in-first-phase/ ## Brookfield AI data center, Cambrai https://datacenters.fru.dev/builds/brookfield-cambrai | operator Brookfield Asset Management | Cambrai, France | 1 GW (1 GW AI factory (per Brookfield's Sweden release)) | Announced | announced Jan 31, 2025 Brookfield's EUR 20 billion French data center program is anchored by a mega-project in Cambrai. - Source (news): https://cio.economictimes.indiatimes.com/news/investments/canadas-brookfield-to-pour-20-billon-into-french-ai-infrastructure/118094156 - Source (news): https://pulse2.com/brookfield-advancing-ai-infrastructure-in-sweden-with-sek-95-billion-investment/ ## Crusoe Childress campus https://datacenters.fru.dev/builds/crusoe-lancium-childress | operator Crusoe | Childress, Texas | 1 GW (1.0 GW grid-connected campus for an unnamed leading hyperscale technology company) | Announced | announced Jul 15, 2026 | target online Construction to begin Q3 2026 | partners Lancium Crusoe and Lancium plan a 1 GW AI data center campus in Childress, Texas, for an unnamed hyperscaler, repeating their Abilene model. - Source (official): https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/ ## Data Center Valley, Ekibastuz https://datacenters.fru.dev/builds/kazakhstan-data-center-valley | operator Firebird | Ekibastuz, Kazakhstan | 1 GW (Phased to 1 GW; first 50 MW due June 2027) | Building | announced Jun 2026 | target online 2027-06 (first 50 MW) | investment USD 10 billion deal $10B | partners Nvidia, government of kazakhstan The USD 10 billion Data Center Valley in Ekibastuz, Kazakhstan, backed by Nvidia and Firebird, is planned to scale to 1 GW. - Source (news): https://oilprice.com/Energy/Energy-General/Kazakhstan-Bets-10-Billion-on-AI-With-Nvidia-Backed-Data-Center-Valley.html - Source (news): https://w.media/kazakhstans-data-center-valley-on-track-to-complete-first-50-mw-facility-in-june-2027/ ## Digital Connexion 1 GW campus, Visakhapatnam https://datacenters.fru.dev/builds/digital-connexion-vizag | operator Digital Connexion | Visakhapatnam, India | 1 GW (1 GW) | Announced | announced Nov 26, 2025 | target online 2030 | investment USD 11 billion $11B | partners Reliance Industries, Brookfield Asset Management, digital realty Digital Connexion, the Reliance, Brookfield and Digital Realty JV, plans a USD 11 billion, 1 GW campus on 400 acres near Visakhapatnam. - Source (news): https://capacityglobal.com/news/reliance-jv-1gw-data-centre-campus/ ## EdgeConneX campus, Skelleftea https://datacenters.fru.dev/builds/edgeconnex-skelleftea | operator EdgeConneX | Skelleftea, Sweden | 1 GW (Up to 1 GW, subject to approvals) | Announced | announced Feb 27, 2026 | partners eqt, lyten EdgeConneX plans to buy a Lyten site in Skelleftea, Sweden, that could become a campus of up to 1 GW. - Source (news): https://w.media/edgeconnex-plans-1gw-data-center-campus-in-skelleftea-sweden/ ## Elsham Tech Park, North Lincolnshire https://datacenters.fru.dev/builds/elsham-tech-park | operator Greystoke | Elsham, United Kingdom | 1 GW (Up to 1 GW IT load across 15 data halls) | Announced | announced May 2025 | target online 2029 (first phase) Elsham Tech Park, a 1 GW AI data center campus on the former RAF Elsham Wolds airfield, received outline planning approval in March 2026. - Source (news): https://www.newcivilengineer.com/latest/uks-largest-ai-data-centre-receives-approval-paving-way-for-10bn-investment-12-03-2026/ - Source (news): https://www.constructionenquirer.com/2026/03/12/uks-biggest-ai-data-centre-plan-approved/ ## Fluidstack AI supercomputer, France https://datacenters.fru.dev/builds/fluidstack-france-1gw | operator Fluidstack | France | 1 GW (Up to 1 GW of dedicated AI compute, expandable beyond 1 GW by 2028) | Announced | announced Feb 10, 2025 | target online 2026 | chips About 500,000 next-generation AI chips in phase 1 Fluidstack signed an MoU with the French government for a nuclear-powered AI supercomputer of up to 1 GW, with a EUR 10 billion first phase. - Source (news): https://www.world-nuclear-news.org/articles/france-tempts-ai-firms-with-its-nuclear-electricity ## Google AI hub Visakhapatnam https://datacenters.fru.dev/builds/google-visakhapatnam | operator Google | Visakhapatnam, India | 1 GW | Announced | announced Oct 14, 2025 | target online 2028 | investment $15B | partners AdaniConneX, Airtel A $15 billion, 1 GW AI hub with AdaniConneX and Airtel; the first phase is expected by mid-2028. - Source (news): https://datacenters.economictimes.indiatimes.com/news/investments-deals/googles-1gw-vizag-data-centre-to-anchor-india-ai-corridor/133582220 ## Meta El Paso https://datacenters.fru.dev/builds/meta-el-paso | operator Meta | El Paso, Texas | 1 GW | Building | announced Oct 15, 2025 | investment more than $10B Meta's 29th data center, broken ground in October 2025 as a site that can scale to 1 GW. - 2025-10-15: capex 1.5 to 10 (https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) - Source (official): https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/ ## Meta Sturgeon County data center https://datacenters.fru.dev/builds/meta-sturgeon-county | operator Meta | Sturgeon County, Canada | 1 GW (1 GW) | Building | announced Jul 8, 2026 Meta broke ground on a 1 GW AI-optimized data center in Sturgeon County, Alberta, its first in Canada, worth more than CAD 13 billion. - Source (official): https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/ ## Microsoft and G42 geothermal data center, Olkaria https://datacenters.fru.dev/builds/microsoft-g42-olkaria-kenya | operator G42 | tenant Microsoft | Naivasha, Kenya | 1 GW (Reported to need about 1 GW of power) | Paused | announced 2024 | target online 2026-05 (missed) | investment USD 1 billion $1B Kenya suspended the USD 1 billion geothermal-powered data center planned with Microsoft and G42 at Olkaria over power needs. - Source (news): https://www.thinkgeoenergy.com/kenya-suspends-plans-for-microsofts-geothermal-powered-data-centre/ ## Morris Technology Park (unverified) https://datacenters.fru.dev/builds/tract-morris-technology-park | operator Tract | Morris, Illinois | 1 GW (1 GW at full build-out) | Announced | announced Jan 15, 2026 | target online Initial energization June 2028; full 1 GW by 2032 | partners comed Tract bought 343 acres in Morris, Illinois, for a 1 GW data center campus with ComEd power, first energization targeted for 2028. - Source (official): https://www.tract.com/news/tract-enters-greater-chicago-market-with-the-acquisition-of-343-acres-to-be-developed-as-a-1gw-data-center-campus-known-as-the-morris-technology-park/ ## Prometheus https://datacenters.fru.dev/builds/meta-prometheus | operator Meta | New Albany, Ohio | 1 GW | Building | announced Jul 14, 2025 | target online 2026 Meta's first gigawatt AI supercluster, expected online in 2026. - Source (official): https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/ - Source (news): https://www.businessinsider.com/oklo-stock-price-meta-ai-nuclear-power-deal-vst-ceg-2026-1 ## Stafford Technology Campus https://datacenters.fru.dev/builds/stack-stafford-technology-campus | operator stack infrastructure | Stafford, Virginia | 1 GW (1+ GW) | Announced | announced Jan 16, 2025 STACK plans its largest development, the 1 GW-plus Stafford Technology Campus in Stafford County, Virginia. - Source (official): https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/ ## Stargate Michigan (The Barn) https://datacenters.fru.dev/builds/stargate-saline-township | operator Oracle | tenant OpenAI | Saline Township, Michigan | 1 GW | Building | announced Oct 30, 2025 | investment about $10B | partners Related Digital, Blackstone Three 550,000 sq ft buildings developed by Related Digital; funding closed in April 2026 and all buildings were under construction by June. - 2026-06-01: status announced to under construction (https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/) - Source (news): https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/ - Source (news): https://www.businessinsider.com/ai-data-center-saline-michigan-funding-openai-stargate-blackstone-pimco-2026-4 ## Stargate UAE https://datacenters.fru.dev/builds/stargate-uae | operator G42 | tenant OpenAI | Abu Dhabi, United Arab Emirates | 1 GW (first 200 MW in 2026) | Building | announced May 22, 2025 | target online 2026 | investment reported $30B | chips NVIDIA GB300 | partners Oracle, Nvidia, Cisco, SoftBank The first 1 GW phase of the 5 GW UAE-US AI Campus, built by G42 with OpenAI, Oracle, Nvidia, Cisco and SoftBank. The UAE is now revising the campus into several sites. - 2026-09-10: The UAE is revising the 5 GW campus into a network of sites after attacks linked to the US-Iran war; G42 says work is progressing (https://www.thedailystar.net/news/technology/news/uae-rethinks-billion-dollar-ai-data-centre-project-after-iran-attacks-report-4271006) - Source (news): https://www.khaleejtimes.com/business/uae-ai-datacentre-open-ai - Source (news): https://www.thedailystar.net/news/technology/news/uae-rethinks-billion-dollar-ai-data-centre-project-after-iran-attacks-report-4271006 ## Stargate Wisconsin (Lighthouse) https://datacenters.fru.dev/builds/stargate-port-washington-lighthouse | operator Vantage Data Centers | tenant OpenAI | Port Washington, Wisconsin | 1 GW (close to 1 GW) | Building | announced Oct 22, 2025 | target online 2028 | investment reported $15B | partners Oracle Four data centers with close to a gigawatt of AI capacity, developed by Vantage with Oracle for OpenAI; completion scheduled for 2028. - 2026-03-06: status announced to under construction (https://www.datacenterdynamics.com/en/news/oracleopenai-drop-plans-to-expand-flagship-abilene-stargate-site-meta-in-talks-to-pick-up-crusoe-capacity-with-nvidias-help/) - Source (official): https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/ - Source (news): https://www.yahoo.com/news/videos/port-washington-residents-first-look-172522982.html ## SuperX AI computing park proposal, Kazakhstan https://datacenters.fru.dev/builds/superx-kazakhstan | operator SuperX AI Technology | Kazakhstan | 1 GW (1 GW proposed: 200 MW in 2027, 300 MW in 2028, 500 MW in 2029) | Announced | announced Jun 23, 2026 | target online 2027-2029 SuperX is in talks with Kazakhstan's government on a proposed 1 GW AI computing park, phased from 2027 to 2029. - Source (news): https://w.media/superx-contemplates-1-gw-ai-computing-park-in-kazakhstan/ ## TCS HyperVault AI data center campus, Hyderabad (unverified) https://datacenters.fru.dev/builds/tcs-hypervault-hyderabad | operator TCS | Hyderabad, India | 1 GW (Up to 1 GW, built in phases) | Announced | announced Sep 5, 2026 TCS subsidiary HyperVault secured 264 acres in Hyderabad for an AI data center campus of up to 1 GW, with up to INR 70,000 crore planned. - Source (news): https://www.moneycontrol.com/news/business/tcs-hypervault-to-build-1gw-ai-data-centre-campus-in-hyderabad-with-up-to-rs-70-000-crore-investment-14023332.html ## Vantage South Wales campuses (Newport CWL1, Bridgend, Bro Tathan) https://datacenters.fru.dev/builds/vantage-south-wales | operator Vantage Data Centers | tenant Nebius | Newport, United Kingdom | 1 GW (More than 1 GW AI-ready capacity planned across three sites) | Partly online Vantage plans more than 1 GW across Newport, Bridgend and Bro Tathan in the South Wales AI Growth Zone, with Nebius leasing capacity at CWL1. - Source (news): https://w.media/nebius-to-expand-uk-ai-capacity-at-vantages-newport-data-center/ ## Zankore by Indosat AI factory platform https://datacenters.fru.dev/builds/zankore-indonesia | operator Indosat Ooredoo Hutchison | Indonesia | 1 GW (Target of 1 GW, starting with 100 MW) | Announced | announced Aug 6, 2026 | chips Nvidia | partners ooredoo, Nokia, Nvidia Indosat, Ooredoo, Nokia and Nvidia launched Zankore, targeting 1 GW of Nvidia AI factory capacity in Indonesia. - Source (official): https://www.nokia.com/newsroom/indosat-ooredoo-group-nokia-and-nvidia-launch-zankore-by-indosat-ready-to-serve-the-region-with-full-stack-ai-infra-platform/ - Source (news): https://w.media/zankore-secures-us-3-1-billion-loan-to-develop-ai-infrastructure-in-indonesia/ ## Colossus 2 https://datacenters.fru.dev/builds/xai-colossus-2 | operator SpaceXAI | Memphis, Tennessee | 946 MW (IT power, target 1,531 MW in early 2027) | Online | target online 2027 | chips NVIDIA B200, B300 | partners Nvidia Operational from September 3, 2026 at about 946 MW of IT power, by Epoch AI's count the largest AI data center. - 2026-09-03: status under construction to online (https://cryptobriefing.com/spacexai-colossus-2-largest-data-center/) - Source (news): https://cryptobriefing.com/spacexai-colossus-2-largest-data-center/ ## CloudHQ Queretaro campus https://datacenters.fru.dev/builds/cloudhq-queretaro | operator CloudHQ | Queretaro, Mexico | 900 MW (900 MW planned; first 200 MW secured) | Announced | announced Sep 25, 2025 | target online 2027 (substations) | investment USD 4.8 billion $4.8B CloudHQ plans a USD 4.8 billion, six-building campus in Queretaro with 900 MW planned and the first 200 MW of power secured. - Source (news): https://mexicobusiness.news/trade-and-investment/news/cloudhq-invests-us48-billion-queretaros-data-center-campus - Source (news): https://www.bnamericas.com/en/news/cloudhq-secures-first-200mw-for-us48bn-data-campus-in-mexico ## Crusoe Abilene expansion for Microsoft https://datacenters.fru.dev/builds/crusoe-abilene-microsoft | operator Crusoe | tenant Microsoft | Abilene, Texas | 900 MW | Announced | announced Mar 27, 2026 Microsoft leases 900 MW at Crusoe's Abilene campus, the capacity OpenAI and Oracle chose not to take when they stopped at 1.2 GW. - Source (news): https://seekingalpha.com/news/4569859-crusoe-confirms-microsoft-as-new-900mw-capacity-customer-at-abilene-data-center-site - Source (news): https://www.houstonchronicle.com/business/article/microsoft-takes-over-a-texas-ai-data-center-22155883.php ## Helios https://datacenters.fru.dev/builds/galaxy-helios | operator Galaxy Digital | tenant CoreWeave | Dickens, Texas | 800 MW (800 MW gross approved power, all committed to CoreWeave (526 MW critical IT); campus path to 3.6 GW) | Partly online | announced Mar 28, 2025 | target online Phase I delivered Q2 2026; Phase II Q2 2027 Galaxy converted its Helios bitcoin site in Dickens County, Texas, into an AI campus leased to CoreWeave; 133 MW of IT was delivered in Q2 2026. - Source (filing): https://www.sec.gov/Archives/edgar/data/1859392/000185939226000084/exhibit992-q22026overvie.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/1859392/000185939225000032/glxy-20250630xpressrelease.htm ## CyrusOne Freestone County (unverified) https://datacenters.fru.dev/builds/cyrusone-freestone-county | operator CyrusOne | Fairfield, Texas | 760 MW (380 MW Phase 1 agreement plus exclusive 380 MW Phase 2 (power supply)) | Announced | announced Feb 9, 2026 | partners constellation, calpine CyrusOne plans a data center beside the Freestone Energy Center in Freestone County, Texas, with 380 MW contracted and 380 MW more in Phase 2. - Source (official): https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas ## Brookfield AI center, Strangnas https://datacenters.fru.dev/builds/brookfield-strangnas | operator Brookfield Asset Management | Strangnas, Sweden | 750 MW (Site capacity to expand from 300 MW to 750 MW) | Announced | announced Jun 11, 2025 | investment Up to SEK 95 billion (about USD 10 billion) $10B Brookfield plans up to SEK 95 billion for a large AI center in Strangnas, Sweden, with capacity rising from 300 MW to 750 MW. - Source (news): https://pulse2.com/brookfield-advancing-ai-infrastructure-in-sweden-with-sek-95-billion-investment/ ## Beacon Point https://datacenters.fru.dev/builds/hut8-beacon-point | operator Hut 8 | Texas | 704 MW (Two 352 MW IT leases with one unnamed high-investment-grade tenant; 1,000 MW utility capacity) | Building | announced May 6, 2026 | target online Initial energization Q1 2027; Phase 2 data hall Q2 2028 | chips Designed to NVIDIA DSX reference architecture | partners aep Hut 8 1 GW campus in Nueces County, Texas, fully leased as 704 MW of IT capacity to one unnamed high-investment-grade tenant. - Source (filing): https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm - Source (official): https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw ## Data4 Escaudain campus https://datacenters.fru.dev/builds/data4-escaudain | operator Data4 | Escaudain, France | 700 MW (700 MW planned) | Announced | announced Jun 2026 | investment EUR 5 billion (USD 5.8 billion) $5.8B Data4 launched a EUR 5 billion, 700 MW campus at the former Parc des Soufflantes site in Escaudain, northern France. - Source (news): https://w.media/data4-launches-e5-billion-data-center-campus-project-in-northern-france/ ## Jurong Island data centre park https://datacenters.fru.dev/builds/jurong-island-dc-park | operator JTC Corporation | Jurong Island, Singapore | 700 MW (Up to 700 MW on 20 hectares) | Announced | announced Oct 27, 2025 | partners edb singapore Singapore set aside 20 hectares on Jurong Island for a green data center park of up to 700 MW. - Source (news): https://www.mingtiandi.com/real-estate/data-centres/singapore-plans-700mw-data-centre-park-on-jurong-island/ - Source (official): https://www.jtc.gov.sg/jurongisland/story-articles/why-singapore-is-building-data-centres-on-jurong-island ## Firmus Project Southgate, South Australia (Tailem Bend, Stirling North) https://datacenters.fru.dev/builds/firmus-project-southgate-sa | operator Firmus Technologies | Tailem Bend, Australia | 600 MW (600 MW firm power for first campuses; 2.7 GW regional pipeline) | Announced | partners gunvor Firmus secured 600 MW of firm power from Gunvor for its first South Australian AI factory campuses at Tailem Bend and Stirling North. - Source (news): https://w.media/firmus-secures-600mw-energy-agreement-to-support-sa-ai-factory-expansion/ ## NEXTDC S7 AI campus with OpenAI, Eastern Creek https://datacenters.fru.dev/builds/nextdc-s7-eastern-creek | operator NEXTDC | tenant OpenAI | Eastern Creek, Australia | 550 MW (Around 550 MW) | Announced | announced Dec 2025 | target online 2027 H2 (first phase) NEXTDC plans a sovereign AI campus at its S7 site in Western Sydney with OpenAI as anchor tenant under OpenAI for Countries. - Source (news): https://www.theurbandeveloper.com/articles/eastern-creek-data-centre-550mw-openai-nextdc ## Prime Data Centers ESB01, Esbjerg https://datacenters.fru.dev/builds/prime-esb01-esbjerg | operator Prime Data Centers | Esbjerg, Denmark | 550 MW (550 MW campus; first phase 160 MW IT) | Announced | announced Mar 31, 2026 | target online Construction could start 2027 | investment First phase DKK 15 billion (USD 2.3 billion) $2.3B | partners brunswick real estate Prime Data Centers and Brunswick Real Estate plan a 550 MW campus on Nordre Tovrupvej in Esbjerg, with a USD 2.3 billion first phase. - Source (news): https://w.media/prime-data-centers-to-build-550-mw-data-center-campus-in-demark/ ## Bell AI Fabric supercluster, British Columbia https://datacenters.fru.dev/builds/bell-ai-fabric-bc | operator Bell Canada | Kamloops, Canada | 500 MW (Upwards of 500 MW across six facilities) | Announced | announced May 28, 2025 | partners Groq Bell AI Fabric plans a hydro-powered AI data center supercluster in British Columbia of up to 500 MW across six facilities. - Source (official): https://www.newswire.ca/news-releases/bell-canada-increases-sovereign-ai-capacity-with-bell-ai-fabric-875549746.html ## Dakhla green data center (unverified) https://datacenters.fru.dev/builds/dakhla-green-data-center | operator Government of Morocco | Dakhla, Morocco | 500 MW (500 MW) | Announced | announced Nov 2025 Morocco plans a 500 MW green data center in Dakhla powered by a dedicated solar and wind farm. - Source (news): https://w.media/morocco-plans-500-mw-green-data-center-in-dakhla/ ## Digital Edge CGK campus, Bekasi https://datacenters.fru.dev/builds/digital-edge-cgk-bekasi | operator Digital Edge | Bekasi, Indonesia | 500 MW (500 MW campus with a 1.45 GW PLN power agreement) | Building | target online 2026 Q4 (CGK1) | investment USD 4.5 billion multi-phase $4.5B Digital Edge topped out CGK1 at its USD 4.5 billion, 500 MW campus in Bekasi and signed a 1.45 GW power deal with PLN. - Source (news): https://w.media/digital-edge-tops-out-cgk1-inks-1-45gw-power-deal/ ## Goodman Project Atlas, Eastern Creek https://datacenters.fru.dev/builds/goodman-project-atlas | operator Goodman Group | Eastern Creek, Australia | 500 MW (Up to 500 MW) | Announced | announced Jan 28, 2026 Goodman lodged plans for a 500 MW data center campus at its Eastern Creek site in western Sydney. - Source (news): https://w.media/goodman-files-plans-for-500-mw-sydney-campus-as-expansion-continues/ ## Khazna and Eni AI campus, Ferrera Erbognone https://datacenters.fru.dev/builds/khazna-eni-ferrera-erbognone | operator Khazna Data Centers | Ferrera Erbognone, Italy | 500 MW (500 MW IT; part of a program of up to 1 GW in Italy) | Announced | announced Jul 15, 2025 | partners eni, G42 Khazna and Eni signed terms for a JV to build a 500 MW AI data center campus in Ferrera Erbognone, Lombardy, powered by a gas plant with CO2 capture. - Source (official): https://www.g42.ai/resources/news/khazna-data-centers-and-eni-partner-develop-500-mw-ai-data-center-campus-near-milan ## Project Jupiter hyperscale data center JV, Germany https://datacenters.fru.dev/builds/wbs-project-jupiter-germany | operator WBS Power | Germany | 500 MW (500 MW hyperscale data center co-located with BESS and solar) | Announced | announced Dec 2025 | partners prime capital WBS Power formed a JV to co-locate a 500 MW hyperscale data center with its Project Jupiter battery and solar site on a former German airfield. - Source (news): https://w.media/wbs-power-sells-project-jupiter-and-forms-jv-for-500-mw-data-center/ ## Sify 500 MW data centre, Visakhapatnam https://datacenters.fru.dev/builds/sify-visakhapatnam | operator Sify Infinit Spaces | Visakhapatnam, India | 500 MW (500 MW) | Announced | announced 2025 | investment INR 15,266 crore (USD 1.6 billion) $1.6B Andhra Pradesh granted Sify extra land for the second phase of its INR 15,266 crore, 500 MW data center project in Visakhapatnam. - Source (news): https://w.media/andhra-pradesh-allocates-extra-25-acres-for-sifys-500-mw-dc/ ## SOS AI and cloud data center campus, Bintan https://datacenters.fru.dev/builds/sos-bintan | operator SOS Limited | Bintan, Indonesia | 500 MW (500 MW potential; phase 1 about 50 MW) | Announced | announced Sep 2026 SOS signed a non-binding memorandum to potentially develop a 500 MW AI and cloud data center campus in Bintan, Indonesia. - Source (news): https://w.media/crypto-firm-sos-inks-indonesian-deal-to-build-500mw-ai-data-center/ ## Stargate Argentina https://datacenters.fru.dev/builds/stargate-argentina | operator Sur Energy | tenant OpenAI | Patagonia, Argentina | 500 MW | Announced | announced Oct 10, 2025 | investment $25B A letter of intent with Sur Energy under Argentina's large-investment regime; no exact site or construction start given. - Source (news): https://www.businessinsider.com/openai-data-center-argentina-sur-engery-ai-compute-2025-10 ## xAI and HUMAIN data center, Saudi Arabia (unverified) https://datacenters.fru.dev/builds/humain-xai-saudi-500mw | operator HUMAIN | tenant SpaceXAI | Saudi Arabia | 500 MW (500 MW data center for xAI) | Announced | announced Nov 19, 2025 | chips Nvidia | partners Nvidia HUMAIN and xAI plan a 500 MW data center in Saudi Arabia powered by Nvidia chips. - Source (news): https://www.nbcnews.com/tech/tech-news/elon-musk-announces-massive-xai-data-center-saudi-arabia-x-rcna244804 ## SDAIA Hexagon government data centre, Riyadh https://datacenters.fru.dev/builds/sdaia-hexagon-riyadh | operator Saudi Data and Artificial Intelligence Authority | Riyadh, Saudi Arabia | 480 MW (480 MW total at completion) | Building | announced Jan 5, 2026 SDAIA began building the Hexagon data center in Riyadh, a Tier IV government facility planned at 480 MW. - Source (news): https://capacityglobal.com/news/saudi-arabia-sdaia-data-centre-government-ai/ ## atNorth FIN04 campus, Myllykoski https://datacenters.fru.dev/builds/atnorth-fin04-myllykoski | operator atNorth | Kouvola, Finland | 430 MW (Total eventual capacity of 430 MW) | Building | announced Jul 2025 | target online 2027 | partners yit atNorth's FIN04 campus in Myllykoski, Kouvola, is planned to reach 430 MW, with YIT building its next facility. - Source (news): https://w.media/yit-to-build-new-atnorth-data-center-in-finland/ ## Justified Data campus https://datacenters.fru.dev/builds/terawulf-hawesville-anthropic | operator TeraWulf | tenant Anthropic | Hawesville, Kentucky | 401 MW (IT capacity) | Building | announced Jul 6, 2026 | target online H2 2027 Anthropic signed a 20-year, $19 billion lease; first capacity in the second half of 2027, fully operational by early 2028. - Source (news): https://www.datacenterdynamics.com/en/news/anthropic-signs-19bn-20-year-lease-for-kentucky-data-center-with-terawulf/ ## CyrusOne Bosque County (Thad Hill) https://datacenters.fru.dev/builds/cyrusone-bosque-county | operator CyrusOne | Meridian, Texas | 400 MW (400 MW of power agreements with Calpine at Thad Hill Energy Center) | Building | partners constellation, calpine CyrusOne is developing a data center campus powered through Calpine at the Thad Hill Energy Center in Bosque County, Texas, under 400 MW of agreements. - Source (official): https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas - Source (official): https://www.cyrusone.com/data-centers/north-america/bosque-county-tx ## NTT DATA and Neysa AI data center cluster, Hyderabad https://datacenters.fru.dev/builds/ntt-neysa-hyderabad | operator NTT DATA | Hyderabad, India | 400 MW (400 MW cluster) | Announced | announced Apr 18, 2025 | investment INR 10,500 crore (about USD 1.2 billion) $1.2B | chips 25,000 GPUs | partners neysa networks NTT DATA, Neysa and Telangana signed an MoU for a 400 MW AI data center cluster in Hyderabad worth INR 10,500 crore. - Source (news): https://w.media/ntt-data-neysa-networks-and-telangana-govt-sign-mou-with-to-build-ai-dc-cluster-worth-rs-10500-crores/ ## Polaris Forge 1 https://datacenters.fru.dev/builds/applied-digital-polaris-forge-1 | operator Applied Digital | tenant CoreWeave | Ellendale, North Dakota | 400 MW (400 MW critical IT across three CoreWeave leases) | Partly online | announced Jun 2, 2025 | target online 2025 Applied Digital campus in Ellendale, North Dakota, leased to CoreWeave for 400 MW of critical IT load under roughly 15-year leases. - Source (official): https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with - Source (official): https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with - Source (official): https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1 ## CoreWeave AI data centers, Indonesia https://datacenters.fru.dev/builds/coreweave-indonesia | operator CoreWeave | Indonesia | 360 MW (360 MW combined across three sites by 2028) | Announced | announced Aug 4, 2026 | target online 2028 CoreWeave plans three AI data centers in Indonesia with 360 MW combined by 2028, its first in Asia-Pacific. - Source (news): https://developingtelecoms.com/telecom-technology/data-centres-networks/20633-coreweave-targets-apac-with-plans-for-three-ai-data-centres-in-indonesia.html ## DataVolt Oxagon AI data center campus https://datacenters.fru.dev/builds/datavolt-oxagon-neom | operator DataVolt | Oxagon, NEOM, Saudi Arabia | 360 MW (360 MW first phase; HUMAIN and DataVolt jointly develop 100 MW of it) | Building | announced Aug 31, 2026 | target online 2028 | partners HUMAIN, neom DataVolt is building a 360 MW first phase of an AI data center campus at Oxagon in NEOM, with HUMAIN co-developing the first 100 MW due in 2028. - Source (official): https://www.neom.com/en-us/newsroom/HUMAIN-and-DataVolt-to-develop-AI-data-center-in-NEOM ## DayOne and Firmus AI campus, Kabil, Batam https://datacenters.fru.dev/builds/dayone-firmus-batam | operator DayOne | tenant Firmus Technologies | Batam, Indonesia | 360 MW (360 MW) | Announced | announced Jun 29, 2026 | chips Up to 170,000 Nvidia accelerators | partners Nvidia DayOne and Firmus are developing a 360 MW AI campus in Batam, with access to up to 170,000 Nvidia accelerators. - Source (news): https://www.mingtiandi.com/real-estate/data-centres/dayone-firmus-building-360mw-data-centre-campus-in-batam/ ## Lake Mariner https://datacenters.fru.dev/builds/terawulf-lake-mariner | operator TeraWulf | tenant Fluidstack | Barker, New York | 360 MW (About 360 MW critical IT contracted to Fluidstack across CB-3, CB-4 and CB-5) | Partly online | announced Aug 14, 2025 | target online CB-5 in second half of 2026 | partners Google TeraWulf is converting its Lake Mariner campus in western New York into AI halls leased to Fluidstack, with Google backstopping the leases. - Source (filing): https://www.sec.gov/Archives/edgar/data/1083301/000110465925079463/tm2523651d3_ex99-1.htm ## AirTrunk MEL2, Melbourne https://datacenters.fru.dev/builds/airtrunk-mel2 | operator AirTrunk | Melbourne, Australia | 354 MW (Over 354 MW) | Announced | announced Dec 23, 2025 AirTrunk bought a site in Melbourne's north-west for MEL2, a 354 MW campus worth more than AUD 5 billion. - Source (official): https://airtrunk.com/airtrunk-expands-australian-platform-with-a-second-hyperscale-data-centre-campus-in-melbourne/ ## atNorth NOR01, Haugaland Business Park https://datacenters.fru.dev/builds/atnorth-nor01-haugaland | operator atNorth | Gismarvik, Norway | 350 MW (120 MW initial phases, scaling to 350 MW) | Announced | announced Jun 3, 2026 | target online 2028 (power) atNorth bought a 36-hectare plot in Haugaland Business Park for NOR01, its first Norwegian site, starting at 120 MW and scaling to 350 MW. - Source (news): https://capacityglobal.com/news/atnorth-enters-norway/ ## Imperial Valley data center https://datacenters.fru.dev/builds/ivcm-imperial-county | operator Imperial Valley Computer Manufacturing | Imperial, California | 330 MW (330 MW load with 330 MW substation and 862 MWh battery storage) | Paused | partners imperial irrigation district A proposed 330 MW data center near Imperial, California; a judge tentatively ruled in Sep 2026 that a full environmental review is required first. - Source (news): https://www.datacenterknowledge.com/data-center-construction/california-judge-orders-full-environmental-review-of-330-mw-data-center ## Nebius AI Factory, Lappeenranta https://datacenters.fru.dev/builds/nebius-lappeenranta | operator Nebius | Lappeenranta, Finland | 310 MW (Up to 310 MW) | Announced | announced Mar 31, 2026 | target online 2027 | investment USD 10 billion $10B Nebius plans a 310 MW AI factory in Lappeenranta, Finland, investing USD 10 billion, with customer availability expected in 2027. - Source (news): https://capacityglobal.com/news/nebius-ai-factory-finland-data-centre-europe/ ## AirTrunk TOK1 expansion, East Tokyo https://datacenters.fru.dev/builds/airtrunk-tok1-expansion | operator AirTrunk | Tokyo, Japan | 300 MW (Campus designed to scale to more than 300 MW; expansion adds over 100 MW) | Building | announced Mar 10, 2026 | investment JPY 191.6 billion (USD 1.2 billion) green loan $1.2B AirTrunk secured a USD 1.2 billion green loan to expand its TOK1 campus in East Tokyo, designed to scale past 300 MW. - Source (news): https://constructiondigital.com/news/inside-airtrunks-1-2bn-major-construction-opportunity ## atNorth Hamre 1, Solleftea https://datacenters.fru.dev/builds/atnorth-hamre-solleftea | operator atNorth | Solleftea, Sweden | 300 MW (300 MW) | Announced | announced Feb 24, 2026 | target online 2028 H1 atNorth plans a 300 MW data center on the 50-hectare Hamre 1 site in Solleftea, Sweden, due in the first half of 2028. - Source (news): https://w.media/atnorth-to-build-300mw-data-center-in-sweden/ ## Barber Lake https://datacenters.fru.dev/builds/cipher-barber-lake | operator Cipher Digital | tenant Fluidstack | Colorado City, Texas | 300 MW (300 MW gross after upsizing; initial lease was 168 MW critical IT) | Building | announced Sep 25, 2025 | target online Delivery Sep 2026, rent from Oct 2026 | partners Google Cipher is building an AI data center at Barber Lake near Colorado City, Texas, leased for 10 years to Fluidstack with a Google backstop. - Source (filing): https://www.sec.gov/Archives/edgar/data/1819989/000095010325012168/dp234624_8k.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/1819989/000181998926000007/exh991q4fy25_earningsprxvf.htm ## Black Pearl https://datacenters.fru.dev/builds/cipher-black-pearl-aws | operator Cipher Digital | tenant AWS | Wink, Texas | 300 MW (300 MW gross, 216 MW critical IT under a 15-year AWS lease) | Building | announced Nov 3, 2025 | target online Rent from Oct 2026 in phases Cipher is converting its Black Pearl site in Wink, Texas, into a 300 MW AI data center leased to Amazon Web Services for 15 years. - Source (filing): https://www.sec.gov/Archives/edgar/data/1819989/000181998925000110/ciphermining_businessupd.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/1819989/000095010326001480/dp240991_ex9901.htm ## Clearstone Ebbsfleet AI Data Center campus https://datacenters.fru.dev/builds/clearstone-ebbsfleet | operator Clearstone | Ebbsfleet, United Kingdom | 300 MW (300 MW) | Announced | announced Jul 2026 | target online 2030 Clearstone plans a 300 MW AI data center campus near Ebbsfleet, Kent, targeting operation in 2030. - Source (news): https://w.media/clearstone-unveils-plans-for-300-mw-ai-dc-campus-in-ebbsfleet/ ## EdgeConneX campuses, Lodi and south Milan https://datacenters.fru.dev/builds/edgeconnex-lombardy | operator EdgeConneX | Lodi, Italy | 300 MW (Three campuses expected to exceed 300 MW combined) | Announced | announced May 2026 | target online 2031 | investment EUR 3 billion (USD 3.5 billion) direct investment by 2031 $3.5B Italy named EdgeConneX's EUR 3 billion plan for three Lombardy campuses, over 300 MW combined by 2031, a project of strategic national interest. - Source (news): https://w.media/italy-fast-tracks-edgeconnex-ai-data-center-project/ ## Firebird AI factory, Armenia https://datacenters.fru.dev/builds/firebird-armenia | operator Firebird | Armenia | 300 MW (300 MW planned by end of 2027) | Partly online | target online 2027 | chips More than 70,000 Nvidia Rubin and Blackwell GPUs | partners Nvidia, dell Firebird launched an Nvidia AI factory in Armenia and plans 300 MW and more than 70,000 GPUs there by end 2027. - Source (official): https://blogs.nvidia.com/blog/firebird-ai-factory-armenia-blackwell-rubin-dsx/ ## Nebius Vineland https://datacenters.fru.dev/builds/nebius-vineland | operator Nebius | tenant Microsoft | Vineland, New Jersey | 300 MW | Partly online | announced Sep 8, 2025 | partners DataOne Developed by DataOne for Nebius to serve its $17 billion Microsoft deal; New Jersey fined it over $1 million in September 2026 for unpermitted gas generators. - 2026-09-22: NJ DEP fined the developer more than $1 million for running 62 gas generators without a permit (https://whyy.org/articles/vineland-data-center-fined/) - Source (news): https://whyy.org/articles/vineland-data-center-fined/ ## NFD Korea AI campus, Dangjin https://datacenters.fru.dev/builds/nfd-korea-dangjin | operator NFD Korea | Dangjin, South Korea | 300 MW (300 MW in six phases; KEPCO supply agreement for 300 MW) | Announced | announced Jul 2026 | target online 2028 Q1 (first phase) NFD Korea is developing a 300 MW AI data center campus in Dangjin with site, permits and a 300 MW KEPCO supply deal secured. - Source (news): https://w.media/nfd-korea-plans-300-mw-ai-dc-campus-in-south-korea/ ## ODATA QR03 campus, Queretaro https://datacenters.fru.dev/builds/odata-qr03-queretaro | operator ODATA | Queretaro, Mexico | 300 MW (Up to 300 MW IT across five buildings; first building 72 MW; plans toward 400 MW) | Partly online | announced May 2, 2025 | investment More than USD 3 billion $3B ODATA opened the first 72 MW building of its QR03 campus in Queretaro, planned at up to 300 MW and more than USD 3 billion. - Source (news): https://capacityglobal.com/news/article-odata-launches-mexicos-largest-data-centre/ ## SoftBank Hokkaido Tomakomai AI Data Center https://datacenters.fru.dev/builds/softbank-tomakomai | operator SoftBank | Tomakomai, Japan | 300 MW (50 MW first phase, eventually 300 MW) | Building | announced Nov 2023 | target online FY2026 (first phase) SoftBank is building an AI data center in Tomakomai, Hokkaido, with a 50 MW first phase due in fiscal 2026 and 300 MW planned. - Source (news): https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/ - Source (official): https://www.softbank.jp/en/sbnews/entry/20260225_01 ## Vantage JHB1 campus (ex-Yondr), Sedenak Tech Park https://datacenters.fru.dev/builds/vantage-jhb1-johor | operator Vantage Data Centers | Kulai, Malaysia | 300 MW (More than 300 MW of IT capacity across three data centers) | Building | announced Sep 2025 | partners yondr Vantage acquired Yondr's 300 MW hyperscale campus in Sedenak Tech Park, Johor, which will host three data centers when complete. - Source (news): https://w.media/vantage-data-centers-completes-purchase-of-yondrs-300mw-data-center-in-johor-closes-us1-6b-investment-in-apac/ ## AirTrunk JHB3 and JHB4, Iskandar Puteri (unverified) https://datacenters.fru.dev/builds/airtrunk-jhb3-jhb4 | operator AirTrunk | Iskandar Puteri, Malaysia | 280 MW (280 MW IT load across JHB3 and JHB4) | Announced | announced Apr 30, 2026 | investment MYR 12 billion (USD 3 billion) $3B AirTrunk plans two new hyperscale campuses, JHB3 and JHB4, in Iskandar Puteri, Johor, adding 280 MW for MYR 12 billion. - Source (official): https://airtrunk.com/airtrunk-doubles-down-in-malaysia-with-two-new-hyperscale-campuses-in-johor-bahru/ ## Datagrid Data Centre Park, Makarewa https://datacenters.fru.dev/builds/datagrid-makarewa | operator Datagrid | Makarewa, New Zealand | 280 MW (280 MW) | Announced | target online 2028 | partners Mercury Datagrid received consent for a 280 MW data center park at Makarewa near Invercargill, New Zealand's largest, due to open in 2028. - Source (news): https://thespinoff.co.nz/business/15-05-2026/why-this-ai-data-centre-might-be-new-zealands-most-important-climate-project - Source (news): https://w.media/datagrid-inks-equipment-supply-deal-for-360mva-substation-to-power-new-zealands-largest-ai-data-center/ ## Polaris Forge 2 https://datacenters.fru.dev/builds/applied-digital-polaris-forge-2 | operator Applied Digital | Harwood, North Dakota | 280 MW (280 MW initial; 200 MW leased to an unnamed investment-grade hyperscaler with right of first refusal on 800 MW more (1 GW potential)) | Building | announced Aug 18, 2025 | target online 2026 initial, full capacity early 2027 | investment $3 billion initial campus $3B A $3 billion, 280 MW AI campus near Harwood, North Dakota, with 200 MW leased to an unnamed investment-grade hyperscaler. - Source (official): https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge - Source (official): https://ir.applieddigital.com/news-events/press-releases/detail/132/applied-digital-announces-5-billion-ai-factory-lease-with ## Denton HPC campus https://datacenters.fru.dev/builds/core-scientific-denton | operator Core Scientific | tenant CoreWeave | Denton, Texas | 260 MW (Just over 260 MW critical IT after a 70 MW expansion) | Partly online | announced Feb 26, 2025 | chips NVIDIA GPUs | partners Nvidia Core Scientific is converting its Denton, Texas, site into a roughly 260 MW GPU data center leased to CoreWeave. - Source (filing): https://www.sec.gov/Archives/edgar/data/1839341/000162828025008312/ex991-coreweavepressrelease.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm ## River Bend https://datacenters.fru.dev/builds/hut8-river-bend | operator Hut 8 | tenant Fluidstack | St. Francisville, Louisiana | 245 MW (245 MW IT leased to Fluidstack; 330 MW initial utility capacity; ROFO for up to 1,000 MW more IT) | Building | announced Dec 17, 2025 | target online Q2 2027 first data hall | partners Anthropic, Google, Entergy Hut 8 campus in West Feliciana Parish, Louisiana, with a 245 MW IT lease to Fluidstack for Anthropic, backstopped by Google. - Source (filing): https://www.sec.gov/Archives/edgar/data/1964789/000110465925122052/hut-20251217xex99d1.htm - Source (official): https://www.hut8.com/news-insights/press-releases/hut-8-announces-ai-infrastructure-partnership-with-anthropic-and-fluidstack ## Riot Rockdale data center campus https://datacenters.fru.dev/builds/riot-rockdale-data-center | operator Riot Platforms | Rockdale, Texas | 241 MW (241 MW critical IT contracted: 191 MW to an unnamed frontier AI lab (20 years) and 50 MW to AMD, with AMD expansion rights to 200 MW) | Partly online | announced Jan 16, 2026 | target online AMD first 25 MW delivered by May 2026 | partners AMD Riot is turning its Rockdale, Texas, bitcoin site into AI data centers, leased to AMD and to an unnamed frontier AI lab for 191 MW. - Source (filing): https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810xex99d1.htm ## Nscale Ward County campus https://datacenters.fru.dev/builds/nscale-ward-county-tx | operator Nscale | tenant Microsoft | Barstow, Texas | 240 MW (About 240 MW campus for Microsoft (financing covers about 200 MW of IT); plan to scale to 1.2 GW) | Building | announced Oct 15, 2025 | target online Phased from Q3 2026 | chips About 104,000 NVIDIA GB300; later Vera Rubin | partners ionic digital, Nvidia Nscale is deploying about 104,000 NVIDIA GB300 GPUs for Microsoft at a roughly 240 MW campus in Ward County, Texas, leased from Ionic Digital. - Source (official): https://www.nscale.com/press-releases/nscale-microsoft-2025 - Source (official): https://www.nscale.com/press-releases/nscale-3-billion-delayed-draw-term-loans ## PDG JC4 campus, Bekasi https://datacenters.fru.dev/builds/pdg-jc4-bekasi | operator Princeton Digital Group | Bekasi, Indonesia | 240 MW (Four 60 MW buildings) | Building | announced Apr 2026 PDG started building JC4 in Greenland International Industrial Center, Bekasi, a 240 MW campus of four buildings. - Source (news): https://w.media/pdg-buys-240-mw-of-powered-land-in-jakarta-for-4th-data-center-in-indonesia/ ## Nscale Narvik (was Stargate Norway) https://datacenters.fru.dev/builds/nscale-narvik | operator Nscale | tenant Microsoft | Narvik, Norway | 230 MW (ambition to add 290 MW) | Building | announced Jul 31, 2025 | target online 2026 | chips NVIDIA Rubin (30,000 for Microsoft) | partners Aker, Nvidia Built by Nscale for an Nscale and Aker joint venture on hydropower. OpenAI announced it as Stargate Norway, then did not sign; Microsoft took the capacity. - 2026-04-15: tenant openai to microsoft (https://www.cnbc.com/2026/04/15/openai-stargate-norway-project-microsoft.html) - Source (official): https://openai.com/index/introducing-stargate-norway/ - Source (news): https://www.cnbc.com/2026/04/15/openai-stargate-norway-project-microsoft.html - Source (news): https://www.datacenterdynamics.com/en/news/microsoft-contracts-30000-nvidia-rubin-gpus-from-nscale-at-data-center-in-narvik-norway/ ## Vantage NV1 https://datacenters.fru.dev/builds/vantage-nv1-storey-county | operator Vantage Data Centers | McCarran, Nevada | 224 MW | Building | announced Jul 15, 2025 | target online First building Q2 2026 | investment Nearly $3B $3B Vantage is building a 224 MW, four-building AI campus in Storey County outside Reno, Nevada, with the first two buildings leased. - Source (official): https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/ ## STACK South Dallas campus https://datacenters.fru.dev/builds/stack-south-dallas-lancaster | operator stack infrastructure | Lancaster, Texas | 220 MW | Announced | announced Apr 29, 2024 STACK plans a 220 MW, AI-ready campus on over 100 acres in Lancaster, south of Dallas, Texas, with dedicated power. - Source (official): https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-texas-footprint-with-a-new-220mw-flagship-south-dallas-campus/ ## Delta Forge 2 https://datacenters.fru.dev/builds/applied-digital-delta-forge-2 | operator Applied Digital | Alabama | 210 MW (210 MW critical IT leased to an unnamed high investment-grade hyperscaler) | Announced | announced Jun 8, 2026 | target online Q1 2028 | investment $3.2 billion per DCD $3.2B Applied Digital fifth AI campus, 210 MW leased to an unnamed hyperscaler; DCD reports it will be a $3.2 billion build in Alabama. - Source (official): https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2 - Source (news): https://www.datacenterdynamics.com/en/news/applied-digital-reveals-32bn-delta-forge-2-ai-data-center-will-be-built-in-alabama/ ## ByteDance data center, Pecem https://datacenters.fru.dev/builds/bytedance-pecem-ceara | operator Omnia | tenant ByteDance | Sao Goncalo do Amarante, Brazil | 200 MW (200 MW planned, potentially rising to almost 1 GW) | Building | announced 2025 | target online 2027 | investment BRL 200 billion (about USD 38.44 billion), as reported by Bloomberg $38B Omnia is building a data center for ByteDance at the Pecem port complex in Ceara, planned at 200 MW and possibly near 1 GW. - Source (news): https://w.media/bytedance-begins-construction-of-us-38-44-billion-data-center-in-brazil/ ## Childress Horizon 1-4 https://datacenters.fru.dev/builds/iren-childress-horizon | operator IREN | tenant Microsoft | Childress, Texas | 200 MW (200 MW critical IT across four liquid-cooled Horizon halls on a 750 MW campus) | Partly online | announced Nov 3, 2025 | target online 2026 in phases | investment GPU and equipment purchase from Dell of about $5.8B; Microsoft contract about $9.7B over five years $5.8B | chips NVIDIA GB300 | partners Nvidia, dell IREN is building four liquid-cooled halls at Childress, Texas, to host NVIDIA GB300 GPUs for Microsoft under a $9.7 billion contract. - Source (filing): https://www.sec.gov/Archives/edgar/data/1878848/000114036125040072/ef20058139_ex99-1.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/1878848/000187884826000051/irenreportsfy26results.htm ## CyrusOne DFW7 https://datacenters.fru.dev/builds/cyrusone-dfw7-fort-worth | operator CyrusOne | Fort Worth, Texas | 200 MW (200 MW campus) | Building | announced Jan 13, 2026 | partners eolian CyrusOne is building the 200 MW DFW7 campus in Fort Worth, Texas, next to an Eolian battery storage site to reuse its grid connection. - Source (official): https://www.cyrusone.com/resources/press-releases/cyrusone-and-eolian-partner-to-enable-rapid-deployment-of-200-megawatt-data-center-campus-in-fort-worth-texas ## Earlham Gigagrid offshore data center, North Sea https://datacenters.fru.dev/builds/orcadian-earlham-offshore | operator Orcadian Energy | United Kingdom | 200 MW (About 200 MW IT load in first phase) | Announced | announced Jul 2026 Orcadian Energy began assessing an offshore power station and 200 MW data center on the Earlham gas discovery in the Southern North Sea. - Source (news): https://w.media/orcadian-pitches-200-mw-offshore-data-center-on-co2-laden-gas-field/ ## Egypt AI data center (Vodafone, Elsewedy, Cassava) (unverified) https://datacenters.fru.dev/builds/egypt-sovereign-ai-dc | operator Cassava Technologies | Egypt | 200 MW (200 MW target, starting with 20 MW) | Announced | announced Sep 9, 2026 | investment USD 1 billion; first 20 MW phase USD 200 million $1B | chips Nvidia | partners Vodafone, elsewedy electric, Nvidia Egypt plans a 200 MW, USD 1 billion AI data center with Nvidia technology, starting with a 20 MW phase by Vodafone, Elsewedy and Cassava. - Source (news): https://www.arabnews.com/business/egypt-moves-to-build-1bn-ai-data-centre-with-nvidia-tech-3001048 ## LG Uplus Paju AI Data Center https://datacenters.fru.dev/builds/lg-uplus-paju | operator LG Uplus | Paju, South Korea | 200 MW (200 MW across five buildings) | Building LG Uplus is building a 200 MW hyperscale AI data center in Paju, Gyeonggi, with five buildings. - Source (news): https://www.lightreading.com/data-centers/lg-uplus-bets-big-on-ai-data-centers-with-3-26b-target ## Microsoft and G42 200 MW expansion via Khazna, UAE https://datacenters.fru.dev/builds/microsoft-g42-uae-200mw | operator Khazna Data Centers | tenant Microsoft | Abu Dhabi, United Arab Emirates | 200 MW (200 MW expansion) | Announced | announced Nov 5, 2025 | target online 2026 (start coming online) | partners G42 Microsoft and G42 are adding 200 MW of data center capacity in the UAE through Khazna, starting to come online before end 2026. - Source (official): https://news.microsoft.com/source/emea/2025/11/microsoft-and-g42-accelerate-uaes-digital-future-with-major-data-centre-expansion/ ## Mistral AI compute sites, Essonne https://datacenters.fru.dev/builds/mistral-bruyeres-le-chatel | operator Mistral AI | Bruyeres-le-Chatel, France | 200 MW (40 MW training site in operation plus 10 MW Les Ulis inference site; plan of 200 MW by 2027 and 1 GW by 2030 across France and Sweden) | Partly online | announced May 29, 2026 | target online 2027 | investment EUR 4 billion (about USD 4.6 billion) compute program across France and Sweden $4.6B Mistral AI runs a 40 MW training site at Bruyeres-le-Chatel and is adding sites in Essonne within a EUR 4 billion compute program. - Source (news): https://w.media/mistral-announces-ai-data-center-expansion-plans-forays-into-industrial-ai-engineering/ ## NAVER GAK Sejong AI factory https://datacenters.fru.dev/builds/naver-gak-sejong-ai-factory | operator NAVER | Sejong, South Korea | 200 MW (Expansion from 55 MW to 200 MW by 2028; 1 GW ambition) | Announced | announced Jul 27, 2026 | target online 2028 | chips Nvidia Vera Rubin and Blackwell | partners Nvidia, Brookfield Asset Management NAVER plans to grow its Nvidia AI factory at GAK Sejong from 55 MW to 200 MW by 2028, with Brookfield financing up to USD 9 billion. - Source (news): https://pulse2.com/nvidia-to-invest-1-billion-as-naver-nvidia-and-brookfield-expand-koreas-national-ai-factory-infrastructure/ ## Schwarz Digits data center, Lubbenau https://datacenters.fru.dev/builds/schwarz-digits-lubbenau | operator Schwarz Digits | Lubbenau, Germany | 200 MW (About 200 MW initial connection, expandable in two phases) | Building | announced Nov 17, 2025 | target online 2027 (first phase) | chips Up to 100,000 GPUs Lidl owner Schwarz Group is building an EUR 11 billion AI data center in Lubbenau with about 200 MW in phase one and up to 100,000 GPUs. - Source (news): https://www.retaildetail.eu/news/food/lidl-owner-schwarz-group-invests-e11-billion-in-giant-data-center/ ## SGI-HCM AI data center campus, Cu Chi https://datacenters.fru.dev/builds/sgi-hcm-campus-cu-chi | operator Kinh Bac City Development | Cu Chi, Vietnam | 200 MW (200 MW planned) | Announced | announced Nov 2025 | investment USD 2 billion estimated $2B | partners accelerated infrastructure capital, vietinbank Kinh Bac City and Accelerated Infrastructure Capital plan a USD 2 billion, 200 MW AI data center campus in Cu Chi, Ho Chi Minh City. - Source (news): https://vir.com.vn/ho-chi-minh-city-backs-2-billion-ai-data-centre-with-dedicated-task-force-143976.html ## Vantage OH1 https://datacenters.fru.dev/builds/vantage-oh1-new-albany | operator Vantage Data Centers | New Albany, Ohio | 192 MW | Building | announced Oct 25, 2024 | target online First building late 2025 | investment Over $2B $2B Vantage broke ground on a 192 MW hyperscale campus in New Albany, Ohio, its first in the Midwest, investing over $2 billion. - Source (official): https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/ ## Vantage VA4 https://datacenters.fru.dev/builds/vantage-va4-stafford | operator Vantage Data Centers | Stafford, Virginia | 192 MW | Building | announced Nov 6, 2025 | target online First building late 2027 | investment $2B $2B Vantage is investing $2 billion in a 192 MW, three-building campus in Stafford County near Fredericksburg, Virginia. - Source (official): https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/ ## Abernathy AI campus https://datacenters.fru.dev/builds/fluidstack-terawulf-abernathy | operator Fluidstack | Abernathy, Texas | 168 MW (168 MW critical IT initial phase, with rights to further phases) | Building | announced Oct 28, 2025 | target online Second half of 2026 | partners TeraWulf, Google A Fluidstack and TeraWulf joint venture building 168 MW of AI capacity at Abernathy, Texas; TeraWulf agreed in July 2026 to sell its stake to Fluidstack. - Source (filing): https://www.sec.gov/Archives/edgar/data/1083301/000110465925102858/tm2529509d1_ex99-1.htm - Source (filing): https://www.sec.gov/Archives/edgar/data/1083301/000110465926080583/tm2619468d1_ex99-1.htm ## Reliance AI data center for Meta, Jamnagar https://datacenters.fru.dev/builds/reliance-meta-jamnagar | operator Reliance Industries | tenant Meta | Jamnagar, India | 168 MW (168 MW with options to scale) | Announced | announced Jun 9, 2026 Reliance will build a 168 MW AI data center in Jamnagar that Meta will lease, its first in India. - Source (official): https://about.fb.com/news/2026/06/meta-partners-with-reliance-on-ai-enabled-data-center-in-india/ ## Compute Nordic AI campus, Mikkeli (Cerebras) https://datacenters.fru.dev/builds/compute-nordic-mikkeli | operator Compute Nordic | tenant Cerebras | Mikkeli, Finland | 165 MW (Scaling in phases to 165 MW; initial 50 MW under construction) | Building | announced Sep 2026 Compute Nordic is building a 165 MW AI data center in Mikkeli, Finland, under seven-year contracts with Cerebras. - Source (news): https://w.media/cerebras-and-compute-nordic-finland-announce-new-165-mw-ai-data-center-in-mikkeli/ ## DPS AI data center with Alibaba affiliate, Melaka https://datacenters.fru.dev/builds/dps-alibaba-melaka | operator DPS Resources Berhad | Melaka, Malaysia | 150 MW (First phase about 150 MW to 180 MW) | Announced | announced Apr 2026 | investment About USD 1.1 billion indicative for 150 MW $1.1B | partners alibaba group DPS Resources signed an MoU with an Alibaba affiliate to explore an AI data center in Melaka, with a first phase of about 150 MW to 180 MW. - Source (news): https://w.media/malaysia-based-dps-inks-mou-with-alibaba-affiliate-for-potential-us-1-billion-ai-data-center-in-melaka/ ## EcoDataCenter campus, Smedjebacken https://datacenters.fru.dev/builds/ecodatacenter-smedjebacken | operator EcoDataCenter | Smedjebacken, Sweden | 150 MW (150 MW with room to expand) | Announced | announced Aug 27, 2026 | target online Construction from 2027 EcoDataCenter agreed to buy 52 hectares in Smedjebacken for a 150 MW campus, its third in Sweden. - Source (news): https://w.media/ecodatacenter-secures-land-for-third-swedish-data-center-campus/ ## SoftBank AI data center, Sharp Sakai plant https://datacenters.fru.dev/builds/softbank-sakai | operator SoftBank | Sakai, Japan | 150 MW (Over 150 MW initially, expected to grow beyond 400 MW) | Announced | announced Jun 7, 2024 | target online 2025 | partners sharp SoftBank plans a large AI data center at the former Sharp Sakai LCD plant, starting above 150 MW and growing past 400 MW. - Source (official): https://www.softbank.jp/en/corp/news/press/sbkk/2024/20240607_01/ ## TELUS sovereign AI factory cluster, British Columbia https://datacenters.fru.dev/builds/telus-sovereign-ai-bc | operator TELUS | Vancouver, Canada | 150 MW (More than 150 MW and 60,000 GPUs by 2032 across Kamloops and two Vancouver sites) | Building | announced May 12, 2026 | target online 2026-2029 | chips Nvidia GPUs | partners westbank TELUS plans three sovereign AI data centers in British Columbia, scaling to more than 150 MW by 2032, after its Rimouski AI Factory sold out. - Source (news): https://rcrwireless.com/20260512/carriers/telus-ai-data-centers ## CyrusOne Jack County campus https://datacenters.fru.dev/builds/cyrusone-jack-county-tx | operator CyrusOne | Jacksboro, Texas | 144 MW (Phase I: two data centers, at least 144 MW IT) | Announced | target online Phase I around 2029 CyrusOne plans two data centers with at least 144 MW of IT in Jack County, Texas, starting on on-site gas power. - Source (official): https://www.cyrusone.com/data-centers/north-america/jack-county-tx ## Echelon Iberdrola Madrid Sur campus https://datacenters.fru.dev/builds/echelon-iberdrola-madrid-sur | operator Echelon Data Centres | Madrid, Spain | 144 MW (144 MW IT with a secured 230 MW grid connection) | Announced | announced Jul 28, 2025 | partners iberdrola The Echelon and Iberdrola JV's first project is Madrid Sur, a 144 MW data center complex with a 230 MW grid connection. - Source (news): https://capacityglobal.com/news/iberdrola-echelon-data-centres-joint-venture-spain/ ## STACK Loudoun County 144 MW campus https://datacenters.fru.dev/builds/stack-loudoun-144mw | operator stack infrastructure | Virginia | 144 MW | Announced | announced Feb 11, 2025 STACK plans a 144 MW hyperscale data center campus in Loudoun County, Virginia. - Source (official): https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/ ## Goodman Project Apollo, Macquarie Park https://datacenters.fru.dev/builds/goodman-project-apollo | operator Goodman Group | Macquarie Park, Australia | 135 MW (135 MW) | Announced | investment AUD 1.4 billion (USD 1.0 billion) $1B NSW approved Goodman's AUD 1.4 billion, 135 MW Project Apollo data center in Macquarie Park, northern Sydney. - Source (news): https://www.mingtiandi.com/real-estate/data-centres/goodman-group-wins-government-approval-for-1b-data-centre-in-sydneys-north/ ## VOLT AI factory, Dubai https://datacenters.fru.dev/builds/volt-dubai-ai-factory | operator VOLT Data Centers | Dubai, United Arab Emirates | 129 MW (29 MW initial plus 100 MW committed) | Announced | announced Apr 2026 | partners diez, Schneider Electric VOLT and Dubai Integrated Economic Zones plan an AI factory in Dubai with 29 MW initially and 100 MW more committed. - Source (news): https://w.media/volt-data-centers-to-build-ai-factory-in-dubai/ ## TikTok data center, Lahti https://datacenters.fru.dev/builds/tiktok-lahti | operator TikTok | Lahti, Finland | 128 MW (50 MW initially, expandable to 128 MW) | Announced | announced Apr 7, 2026 | investment EUR 1 billion (USD 1.16 billion), part of EUR 12 billion Project Clover $1.16B TikTok plans a second Finnish data center in Lahti, a EUR 1 billion project starting at 50 MW and expandable to 128 MW. - Source (news): https://w.media/tiktok-doubles-down-on-finland-with-second-e1-billion-data-center/ - Source (news): https://capacityglobal.com/news/tiktok-second-data-centre-finland-data-centre-of-the-month/ ## Tydal Data Center, Norway https://datacenters.fru.dev/builds/bitdeer-tydal | operator Bitdeer | tenant Volta | Tydal, Norway | 121 MW (121 MW IT, 133 MW gross) | Announced | announced Aug 2026 | chips Nvidia GPUs | partners Nvidia, dell Bitdeer signed a USD 4.7 billion lease with Volta for 121 MW of IT capacity at its Tydal facility in Norway for a leading AI lab. - Source (news): https://w.media/bitdeer-signs-us-4-7-billion-lease-agreement-for-ai-data-center-in-norway/ ## BDx AI Campus 2 (CGK4), West Java https://datacenters.fru.dev/builds/bdx-cgk4-west-java | operator BDx Data Centers | Indonesia | 120 MW (Building 1 of six delivers 120 MW; campus backed by 845 MVA grid capacity) | Building | target online 2027 (first phase) | partners i squared capital BDx broke ground on its CGK4 AI campus in West Java, where the first of six buildings will deliver 120 MW. - Source (news): https://w.media/bdx-breaks-ground-on-ai-data-center-in-west-java-first-120mw-building-to-be-ready-by-early-2027/ ## PDG JC3 campus, Greater Jakarta https://datacenters.fru.dev/builds/pdg-jc3-jakarta | operator Princeton Digital Group | Bekasi, Indonesia | 120 MW (120 MW) | Building | announced Nov 2025 | target online 2026 Q4 (first phase) | investment USD 1 billion $1B PDG broke ground on JC3, a USD 1 billion, 120 MW hyperscale and AI campus near Jakarta. - Source (news): https://w.media/princeton-digital-group-breaks-ground-on-usd-1-billion-120-mw-jakarta-campus/ ## Reliance multi-gigawatt AI data centers, Jamnagar https://datacenters.fru.dev/builds/reliance-jio-jamnagar-ai | operator Reliance Industries | Jamnagar, India | 120 MW (Multi-gigawatt plan; more than 120 MW expected online in H2 2026) | Building | announced Feb 19, 2026 | target online 2026 H2 (first 120 MW) | investment INR 10 trillion (about USD 110 billion) national AI plan over seven years $110B Reliance has begun building multi-gigawatt AI data centers in Jamnagar, with over 120 MW due online in the second half of 2026. - Source (news): https://techcrunch.com/2026/02/19/reliance-unveils-110b-ai-investment-plan-as-india-ramps-up-tech-ambitions/ ## Yotta D4, Greater Noida (unverified) https://datacenters.fru.dev/builds/yotta-greater-noida-d4 | operator Yotta Data Services | Greater Noida, India | 120 MW (120 MW building) | Building | announced Sep 10, 2026 | chips 40,000 Nvidia Vera Rubin GPUs Yotta is starting construction of a 120 MW data center in Greater Noida to host 40,000 Nvidia Vera Rubin GPUs. - Source (news): https://www.moneycontrol.com/news/business/information-technology/yotta-plans-40-000-vera-rubin-gpus-for-new-noida-data-centre-eyes-12-billion-investment-14026856.html ## AMD, Cisco and HUMAIN AI infrastructure JV https://datacenters.fru.dev/builds/humain-amd-cisco-jv | operator HUMAIN | Saudi Arabia | 100 MW (100 MW first phase, up to 1 GW by 2030) | Building | announced Nov 19, 2025 | target online 2026 | chips AMD Instinct MI450 Series GPUs | partners AMD, Cisco AMD, Cisco and HUMAIN formed a JV to deliver up to 1 GW of AI infrastructure in Saudi Arabia by 2030, starting with 100 MW. - Source (official): https://newsroom.cisco.com/c/r/newsroom/en/us/a/y2025/m11/amd-cisco-and-humain-to-form-joint-venture-to-deliver-world-leading-ai-infrastructure.html ## CoreWeave Lancaster https://datacenters.fru.dev/builds/coreweave-lancaster | operator CoreWeave | Lancaster, Pennsylvania | 100 MW (Initial 100 MW with potential to expand to 300 MW) | Announced | investment Up to $6B commitment to equip the data center $6B CoreWeave committed up to $6 billion to equip an AI data center in Lancaster, Pennsylvania, starting at 100 MW with room for 300 MW. - Source (filing): https://www.sec.gov/Archives/edgar/data/1769628/000176962825000059/coreweave3q25earningspress.htm ## Digital Edge DC EEC project, Thailand https://datacenters.fru.dev/builds/digital-edge-bgrimm-eec | operator Digital Edge | Thailand | 100 MW (100 MW) | Announced | announced Jun 2025 | target online 2026 Q4 | investment About USD 1 billion $1B | partners b grimm power Digital Edge and B.Grimm Power formed a JV and unveiled a 100 MW, USD 1 billion data center in Thailand's Eastern Economic Corridor. - Source (news): https://w.media/digital-edge-partners-b-grimm-to-build-data-centers-in-thailand-unveils-100mw-eec-project/ ## Foxconn and Nvidia AI factory, Kaohsiung https://datacenters.fru.dev/builds/foxconn-nvidia-taiwan | operator Foxconn | Kaohsiung, Taiwan | 100 MW (Targeted 100 MW, built in phases starting at 20 MW) | Announced | announced May 20, 2025 | chips Nvidia | partners Nvidia, TSMC Foxconn and Nvidia plan an AI data center in Taiwan targeted at 100 MW, built in phases with some in Kaohsiung. - Source (news): https://www.cnbc.com/2025/05/20/taiwans-foxconn-ai-data-center-with-nvidia-to-have-100-mw-of-power.html ## HUMAIN data centers, Riyadh and Dammam https://datacenters.fru.dev/builds/humain-riyadh-dammam | operator HUMAIN | Riyadh, Saudi Arabia | 100 MW (Initial capacity of up to 100 MW across Riyadh and Dammam; HUMAIN targets 1.9 GW by 2030) | Building | announced Aug 25, 2025 | target online 2026 Q2 | chips 18,000 Nvidia chips approved locally HUMAIN broke ground on AI data centers in Riyadh and Dammam with up to 100 MW initially, using Nvidia chips, as part of a 1.9 GW plan. - Source (news): https://capacityglobal.com/news/humain-data-centre-construction-saudi-arabia/ ## Khazna AI-ready data center, Ankara https://datacenters.fru.dev/builds/khazna-ankara | operator Khazna Data Centers | Ankara, Türkiye | 100 MW (Up to 100 MW) | Announced | announced Apr 2025 | partners G42 Khazna secured a site in Baskent OIZ, Ankara, for an AI-ready data center of up to 100 MW. - Source (news): https://w.media/khazna-data-centers-to-build-100mw-ai-ready-data-center-in-turkey/ ## Stargate India (OpenAI and Tata HyperVault) https://datacenters.fru.dev/builds/stargate-india-tata-hypervault | operator TCS | tenant OpenAI | India | 100 MW (100 MW initial capacity for OpenAI, with plans to scale to 1 GW) | Announced | announced Feb 19, 2026 | partners tata group OpenAI will be the first customer of TCS HyperVault, starting with 100 MW of AI data center capacity in India and aiming for 1 GW. - Source (news): https://techcrunch.com/2026/02/18/openai-taps-tata-for-100mw-ai-data-center-capacity-in-india-eyes-1gw/ ## Nscale AI Campus, Loughton (Microsoft) https://datacenters.fru.dev/builds/microsoft-nscale-loughton | operator Nscale | tenant Microsoft | Loughton, United Kingdom | 90 MW (50 MW, scalable to 90 MW; 90 MW grid connection) | Building | announced Sep 16, 2025 | target online 2027 Q1 (grid power delayed) | chips 23,040 Nvidia GB300 GPUs initially | partners Nvidia Nscale is building a GBP 2 billion AI campus in Loughton with Microsoft as anchor tenant, 50 MW scalable to 90 MW, though grid power is delayed. - Source (official): https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement - Source (news): https://thenextweb.com/news/nscale-essex-data-centre-uk-grid-delay ## AWS Saudi Arabia Region and HUMAIN AI Zone https://datacenters.fru.dev/builds/aws-saudi-arabia-region | operator AWS | Saudi Arabia | 50 MW (Up to 50 MW in the HUMAIN AI Zone by 2028) | Building | announced Aug 31, 2026 | target online Dec 2026 | investment USD 5.3 billion (SAR 19.88 billion) for the region; AWS and HUMAIN plan over USD 5 billion more for the AI Zone $5.3B | chips AWS Trainium and Nvidia | partners HUMAIN AWS will launch its first Saudi cloud region by December 2026 with a USD 5.3 billion investment and deliver up to 50 MW in HUMAIN's AI Zone. - Source (official): https://www.aboutamazon.com/news/aws/aws-cloud-region-saudi-arabia - Source (news): https://w.media/aws-and-humain-to-invest-us-5-billion-in-ai-zone-in-saudi-arabia/ ## Scala AI City, Eldorado do Sul https://datacenters.fru.dev/builds/scala-ai-city | operator Scala Data Centers | Eldorado do Sul, Brazil | 50 MW (50 MW first phase, up to 5 GW long term) | Announced | announced Sep 11, 2024 | target online 2028-2029 | investment Initial BRL 2.6 billion (USD 500 million) $0.5B Scala plans an AI campus in Eldorado do Sul starting at 50 MW and aiming for up to 5 GW, with operations expected around 2028. - Source (news): https://www.bnamericas.com/en/news/scala-data-centers-now-sees-brazil-ai-city-ready-by-2028 ## Nexus AI Factory, Morocco https://datacenters.fru.dev/builds/nexus-ai-factory-morocco | operator Nexus Core Systems | Nouaceur, Morocco | 36 MW (16 MW phase 1 in Nouaceur plus 20 MW phase 2 in northern Morocco) | Announced | announced Apr 2026 | target online 2027 | investment MAD 12 billion (USD 1.29 billion) $1.29B | partners Nvidia, taqa morocco Nexus Core Systems signed an MoU to invest MAD 12 billion in a two-phase AI factory in Morocco, starting in Nouaceur. - Source (news): https://developingtelecoms.com/telecom-technology/data-centres-networks/20099-nexus-to-build-us-1-2-billion-ai-factory-in-morocco.html ## AMACO off-grid AI data center, Mombasa https://datacenters.fru.dev/builds/amaco-mombasa | operator AMACO Energy Group | Mombasa, Kenya | capacity not stated | Announced | announced Aug 2026 | investment KES 194 billion (USD 1.5 billion) $1.5B Greek firm AMACO is seeking approval for a USD 1.5 billion off-grid AI data center in Mombasa, Kenya. - Source (news): https://w.media/amaco-seeks-approval-for-us-1-5-billion-off-grid-ai-data-center-in-kenya/ ## AWS Asia Pacific (Hyderabad) Region expansion https://datacenters.fru.dev/builds/aws-hyderabad-expansion | operator AWS | Hyderabad, India | capacity not stated | Building | investment USD 7 billion in Telangana over 14 years; part of USD 21 billion India cloud plan for 2026 to 2030 $7B AWS broke ground on a new data center to expand its Hyderabad region, part of a planned USD 7 billion investment in Telangana. - Source (official): https://www.aboutamazon.in/news/aws/aws-data-centre-hyderabad - Source (news): https://constructionreviewonline.com/amazon-to-invest-7-billion-in-massive-data-center-expansion-in-hyderabad-india/ ## AWS Asia Pacific (New Zealand) Region, Auckland https://datacenters.fru.dev/builds/aws-new-zealand-region | operator AWS | Auckland, New Zealand | capacity not stated | Online | target online Sep 1, 2025 AWS opened its New Zealand region with three availability zones, backed by an NZD 7.5 billion investment. - Source (official): https://aws.amazon.com/blogs/aws/now-open-aws-asia-pacific-new-zealand-region/ ## AWS Butts and Douglas counties https://datacenters.fru.dev/builds/aws-georgia-butts-douglas | operator AWS | Jackson, Georgia | capacity not stated | Announced | announced Jan 7, 2025 | investment At least $11B across Butts and Douglas counties $11B AWS plans at least $11 billion for data centers in Butts and Douglas counties, Georgia, to support AI and cloud. - Source (official): https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure ## AWS Chile cloud region, Santiago (unverified) https://datacenters.fru.dev/builds/aws-chile-region | operator AWS | Santiago, Chile | capacity not stated | Building | target online 2026 (end of year) | investment USD 4 billion $4B AWS is nearing launch of its Chile region, with sites in Huechuraba, Padre Hurtado and Lampa and a USD 4 billion commitment. - Source (news): https://www.bnamericas.com/en/features/with-own-and-two-third-party-data-centers-aws-nears-chile-cloud-region-launch ## AWS Europe (Spain) Region expansion, Aragon https://datacenters.fru.dev/builds/aws-aragon-spain | operator AWS | Zaragoza, Spain | capacity not stated | Partly online | announced Mar 2, 2026 | target online 2035 | investment EUR 33.7 billion (about USD 39.8 billion) through 2035, including EUR 15.7 billion announced in 2024 $40B Amazon raised its Spain investment to EUR 33.7 billion through 2035, expanding AWS data centers in Aragon including Huesca, Zaragoza and Teruel. - Source (official): https://www.aboutamazon.com/news/company-news/amazon-spain-investment ## AWS Hinds County (former Delphi plant) https://datacenters.fru.dev/builds/aws-hinds-county-delphi | operator AWS | Clinton, Mississippi | capacity not stated | Announced | announced Apr 9, 2026 | investment $1B $1B Amazon is converting the former Delphi manufacturing plant in Hinds County, Mississippi, into a $1 billion data center. - Source (official): https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers ## AWS Madison County campuses https://datacenters.fru.dev/builds/aws-madison-county-ms | operator AWS | Canton, Mississippi | capacity not stated | Partly online | announced Jan 25, 2024 | investment $10B announced 2024 plus an additional $11B in 2026 $21B AWS data center complexes in two Madison County, Mississippi, industrial parks; the 2024 $10 billion plan grew by $11 billion in 2026. - Source (official): https://www.aboutamazon.com/news/aws/aws-10-billion-investment-mississippi - Source (official): https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers ## AWS Mexico (Central) Region, Queretaro https://datacenters.fru.dev/builds/aws-mexico-central | operator AWS | Queretaro, Mexico | capacity not stated | Online | announced Feb 2024 | target online Jan 14, 2025 | investment More than USD 5 billion over 15 years $5B AWS opened its Mexico (Central) Region in Queretaro with three availability zones, planning over USD 5 billion over 15 years. - Source (official): https://aws.amazon.com/blogs/aws/now-open-aws-mexico-central-region/ ## AWS Montgomery County campus (unverified) https://datacenters.fru.dev/builds/aws-montgomery-county-mo | operator AWS | Montgomery City, Missouri | capacity not stated | Announced | announced Jun 15, 2026 | partners ameren missouri Amazon plans a multibillion-dollar data center campus in Montgomery County, Missouri, with over 400 full-time jobs. - Source (official): https://www.aboutamazon.com/news/company-news/amazon-data-center-missouri-new-jobs ## AWS northwest Louisiana campuses https://datacenters.fru.dev/builds/aws-northwest-louisiana | operator AWS | Shreveport, Louisiana | capacity not stated | Announced | announced Feb 23, 2026 | investment $12B announced Feb 2026, raised to $18B with a third campus in Aug 2026 $18B | partners stack infrastructure, swepco Amazon plans three data center campuses across Caddo and Bossier parishes and Shreveport, Louisiana, now an $18 billion plan. - Source (official): https://www.aboutamazon.com/news/company-news/amazon-data-center-louisiana-new-jobs ## AWS Ohio expansion (Fayette County first site) https://datacenters.fru.dev/builds/aws-ohio-fayette-county | operator AWS | Washington Court House, Ohio | capacity not stated | Announced | announced Jun 26, 2023 | target online By end of 2030 across up to eight sites | investment $10B statewide by 2030 (up from $7.8B in 2023); about $5B at the first Fayette County site $10B AWS plans $10 billion of new Ohio data center investment through 2030, starting with about $5 billion in Fayette County. - Source (official): https://www.aboutamazon.com/news/aws/aws-continues-to-invest-in-ohio ## AWS Pennsylvania campuses https://datacenters.fru.dev/builds/aws-pennsylvania-salem | operator AWS | Salem Township and Falls Township, Pennsylvania | capacity not stated | Building | announced Jun 9, 2025 | investment $20B Amazon's $20 billion Pennsylvania plan, starting with AI data center campuses in Salem Township and Falls Township. - Source (official): https://www.aboutamazon.com/news/company-news/amazon-invests-20-billion-pennsylvania-ai-infrastructure - Source (news): https://capitalandmain.com/pennsylvanias-amazon-data-center-boom-is-fueled-by-a-lucrative-tax-break ## AWS Richmond County https://datacenters.fru.dev/builds/aws-richmond-county-nc | operator AWS | Richmond County, North Carolina | capacity not stated | Building | announced Jun 4, 2025 | investment $10B A $10 billion AWS campus; state air permits came in August 2026, and regulators rejected Duke Energy's gas turbines for it in September. - 2026-09-18: NC regulators denied Duke Energy's $584 million gas turbine proposal near the campus (https://www.msn.com/en-us/news/other/nc-regulators-deny-duke-energys-584-million-gas-turbine-proposal-near-amazon-data-center/ar-AA2cwkzm) - 2026-08-29: State regulators approved the air permits for the diesel generators (https://www.wunc.org/2026-08-29/amazons-richmond-county-data-center-gets-green-light-on-air-quality-permits) - Source (official): https://www.aboutamazon.com/news/company-news/amazon-north-carolina-data-center-investment - Source (news): https://www.wunc.org/2026-08-29/amazons-richmond-county-data-center-gets-green-light-on-air-quality-permits ## AWS Tokyo and Osaka region expansion https://datacenters.fru.dev/builds/aws-japan-tokyo-osaka | operator AWS | Tokyo, Japan | capacity not stated | Announced | announced Jan 19, 2024 | target online 2027 | investment JPY 2.26 trillion (about USD 15.24 billion) through 2027 $15B AWS plans JPY 2.26 trillion through 2027 to expand its data center capacity in Tokyo and Osaka. - Source (news): https://siliconangle.com/2024/01/19/aws-will-invest-15b-japan-expand-local-data-center-footprint/ ## AWS Warren County campus https://datacenters.fru.dev/builds/aws-warren-county-ms | operator AWS | Vicksburg, Mississippi | capacity not stated | Announced | announced Nov 20, 2025 | investment At least $3B $3B Amazon plans at least $3 billion for an AI and cloud data center campus in Warren County, Mississippi. - Source (official): https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment ## Blackstone data centers, Aragon https://datacenters.fru.dev/builds/blackstone-aragon | operator Blackstone | Zaragoza, Spain | capacity not stated | Announced | announced Oct 15, 2024 | investment EUR 7.5 billion (USD 8.2 billion) $8.2B Blackstone plans to invest EUR 7.5 billion in data centers in Aragon, Spain, to lease to tenants. - Source (news): https://www.silicon.co.uk/e-innovation/blackstone-to-invest-e7-5-billion-for-data-centres-in-spain-584384 ## Colossus https://datacenters.fru.dev/builds/xai-colossus-memphis | operator SpaceXAI | Memphis, Tennessee | capacity not stated | Online | announced Sep 2, 2024 | chips 200,000 NVIDIA GPUs Built in 122 days, then doubled to 200,000 GPUs in 92 days. xAI now trades as SpaceXAI. - Source (official): https://x.ai/colossus ## Compass Hoffman Estates campus (former Sears HQ) https://datacenters.fru.dev/builds/compass-hoffman-estates | operator Compass Datacenters | Hoffman Estates, Illinois | capacity not stated | Building | announced Jun 13, 2024 | investment About $10B once operational $10B | partners comed Compass is turning the former Sears headquarters in Hoffman Estates, Illinois, into a five-building hyperscale campus worth about $10 billion. - Source (official): https://www.compassdatacenters.com/news/compass-kicks-off-development-of-its-first-hyperscale-campus-in-illinois/ ## Compass Meridian campus https://datacenters.fru.dev/builds/compass-meridian-ms | operator Compass Datacenters | Meridian, Mississippi | capacity not stated | Building | announced Jan 9, 2025 | target online Eight data centers over eight years | investment $10B at full fit-out, including tenant IT equipment $10B Compass is building an eight-building hyperscale campus in Meridian, Mississippi, a $10 billion investment at full fit-out. - Source (official): https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/ ## CyrusOne Lee County campus https://datacenters.fru.dev/builds/cyrusone-lee-county-nc | operator CyrusOne | Sanford, North Carolina | capacity not stated | Announced | investment Over $900M Phase I; about $7B at full buildout $7B CyrusOne plans a multi-phase data center campus in Lee County, North Carolina, projected at about $7 billion at full buildout. - Source (official): https://www.cyrusone.com/data-centers/north-america/lee-county-north-carolina ## CyrusOne Medina County campus https://datacenters.fru.dev/builds/cyrusone-medina-county-tx | operator CyrusOne | Hondo, Texas | capacity not stated | Announced | investment About $4B to $6B across multiple phases $4B CyrusOne plans a multi-phase data center project in Medina County, Texas, expected to cost about $4 billion to $6 billion. - Source (official): https://www.cyrusone.com/data-centers/north-america/medina-county ## CyrusOne Sulphur Springs campus https://datacenters.fru.dev/builds/cyrusone-sulphur-springs-tx | operator CyrusOne | Sulphur Springs, Texas | capacity not stated | Announced | investment $5B to $10B if fully built $5B CyrusOne is evaluating a phased campus in Sulphur Springs, Texas, that could reach $5 billion to $10 billion if fully built. - Source (official): https://www.cyrusone.com/data-centers/north-america/sulphur-springs-texas ## CyrusOne Yorkville Technology Campus https://datacenters.fru.dev/builds/cyrusone-yorkville-il | operator CyrusOne | Yorkville, Illinois | capacity not stated | Building | investment More than $1B at full buildout $1B CyrusOne is developing a technology campus in Yorkville, Illinois, approved in 2024, with more than $1 billion of planned investment. - Source (official): https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus ## DayOne hyperscale data centre, Lahti https://datacenters.fru.dev/builds/dayone-lahti | operator DayOne | Lahti, Finland | capacity not stated | Building | announced Aug 2025 | target online 2027 DayOne is investing EUR 1.2 billion in a hyperscale data center on a former industrial site in Kiverio, Lahti, ready in 2027. - Source (news): https://capacityglobal.com/news/dayone-hyperscale-data-centre-finland/ ## Deutsche Telekom and Nvidia Industrial AI Cloud, Munich https://datacenters.fru.dev/builds/telekom-nvidia-munich | operator Deutsche Telekom | Munich, Germany | capacity not stated | Announced | announced Nov 4, 2025 | target online Early 2026 | investment EUR 1 billion (USD 1.15 billion) $1.15B | chips Up to 10,000 Nvidia Blackwell GPUs | partners Nvidia, SAP Deutsche Telekom and Nvidia set up a EUR 1 billion AI factory in Munich with up to 10,000 Blackwell GPUs for German industry. - Source (news): https://techcrunch.com/2025/11/04/nvidia-deutsche-telekom-strike-e1b-partnership-for-a-data-center-in-munich/ ## Echelon LIN10, Milan https://datacenters.fru.dev/builds/echelon-lin10-milan | operator Echelon Data Centres | Milan, Italy | capacity not stated | Building | announced Oct 8, 2025 | target online 18 to 24 months from start | investment EUR 3 billion (USD 3.5 billion) $3.5B | partners starwood capital Echelon and Starwood Capital bought a 37-acre site near Milan for LIN10, a EUR 3 billion campus with 250 MVA of capacity. - Source (news): https://w.media/echelon-and-starwood-capital-partner-to-develop-a-data-center-campus-in-milan/ ## Fairwater Atlanta https://datacenters.fru.dev/builds/microsoft-fairwater-atlanta | operator Microsoft | Atlanta, Georgia | capacity not stated | Online | announced Nov 12, 2025 | chips NVIDIA GB200, GB300 | partners Nvidia The second Fairwater site, linked to Wisconsin over Microsoft's AI WAN so one training job can span both. - Source (official): https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/ - Source (news): https://www.techtimes.com/articles/319205/20260627/microsoft-opens-fairwater-wisconsin-ai-campus-runs-one-supercomputer-via-800g-ethernet.htm ## Fairwater Wisconsin https://datacenters.fru.dev/builds/microsoft-fairwater-wisconsin | operator Microsoft | Mount Pleasant, Wisconsin | capacity not stated | Online | announced May 2024 | target online 2026 | investment $7.3B | chips NVIDIA GB200 | partners Nvidia Three buildings on 315 acres run as one supercomputer; fully operational in June 2026, with a second facility under construction next door. - 2026-06-23: status under construction to online (https://www.techtimes.com/articles/319205/20260627/microsoft-opens-fairwater-wisconsin-ai-campus-runs-one-supercomputer-via-800g-ethernet.htm) - 2025-09-18: capex 3.3 to 7.3 (https://www.techtimes.com/articles/319205/20260627/microsoft-opens-fairwater-wisconsin-ai-campus-runs-one-supercomputer-via-800g-ethernet.htm) - Source (official): https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/ - Source (news): https://www.techtimes.com/articles/319205/20260627/microsoft-opens-fairwater-wisconsin-ai-campus-runs-one-supercomputer-via-800g-ethernet.htm ## Forestalia Bufalo Project (Magallon, Botorrita, Alfamen) https://datacenters.fru.dev/builds/forestalia-bufalo-aragon | operator Forestalia | Magallon, Spain | capacity not stated | Announced | announced Nov 18, 2025 | target online Early 2030s | investment EUR 12 billion (USD 14 billion) across three data centers $14B Forestalia plans EUR 12 billion for three data centers in Zaragoza province at Magallon, Botorrita and Alfamen, known as the Bufalo Project. - Source (news): https://w.media/forestalia-to-invest-us-14-billion-in-three-aragon-data-centers/ ## G42, FPT and Viet Thai data centers, Vietnam https://datacenters.fru.dev/builds/g42-vietnam-data-centers | operator G42 | Vietnam | capacity not stated | Announced | announced Feb 9, 2026 | partners fpt, viet thai group G42, FPT and Viet Thai Group signed a framework to build three data centers in Vietnam with up to USD 1 billion in consumption commitments. - Source (news): https://www.thenationalnews.com/future/technology/2026/02/09/g42-ai-vietnam/ ## Google and Turkcell hyperscale region, Turkiye https://datacenters.fru.dev/builds/google-turkcell-turkiye | operator Google | Türkiye | capacity not stated | Announced | announced Nov 2025 | investment USD 3 billion (Google USD 2 billion over 10 years, Turkcell USD 1 billion) $3B | partners turkcell Google and Turkcell plan to invest USD 3 billion in Turkiye's first hyperscale cloud region data center. - Source (news): https://www.turkiyetoday.com/business/chinese-alibaba-joins-us-rivals-with-plans-for-turkiye-data-center-3228766 ## Google Cedar Rapids data center https://datacenters.fru.dev/builds/google-cedar-rapids-ia | operator Google | Cedar Rapids, Iowa | capacity not stated | Announced | announced May 30, 2025 | investment $7B in Iowa within two years, covering the new Cedar Rapids data center and Council Bluffs expansion $7B Google is investing $7 billion in Iowa, including a new data center in Cedar Rapids and expansion in Council Bluffs. - Source (official): https://blog.google/feed/new-7-billion-investment-iowa/ ## Google Chesterfield County data center https://datacenters.fru.dev/builds/google-chesterfield-va | operator Google | Chesterfield, Virginia | capacity not stated | Announced | announced Aug 27, 2025 | investment $9B in Virginia through 2026, including the new Chesterfield County data center $9B Google is investing $9 billion in Virginia through 2026, including a new data center in Chesterfield County. - Source (official): https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-virginia/ ## Google Cloud and PIF AI hub, Saudi Arabia https://datacenters.fru.dev/builds/google-pif-saudi-ai-hub | operator Google | Saudi Arabia | capacity not stated | Announced | announced 2024 | investment USD 10 billion joint investment $10B | partners pif, HUMAIN Google Cloud and PIF are building a USD 10 billion global AI hub in Saudi Arabia, to launch with HUMAIN. - Source (official): https://www.googlecloudpresscorner.com/2025-05-13-Google-Cloud-and-PIF-Advance-AI-Hub-in-Saudi-Arabia ## Google data center and cloud region, Elmina Business Park https://datacenters.fru.dev/builds/google-elmina-malaysia | operator Google | Shah Alam, Malaysia | capacity not stated | Building | announced May 30, 2024 | investment USD 2 billion $2B Google broke ground on its first Malaysian data center and cloud region at Elmina Business Park, Selangor, a USD 2 billion investment. - Source (official): https://www.googlecloudpresscorner.com/2024-10-1-Google-Breaks-Ground-on-US-2-Billion-Malaysia-Data-Center-and-Cloud-Region,-Announces-Support-for-New-Sustainability-and-Skilling-Initiatives ## Google data center, Chonburi https://datacenters.fru.dev/builds/google-chonburi-thailand | operator Google | Chonburi, Thailand | capacity not stated | Announced | investment USD 1 billion for a Chonburi data center and Bangkok cloud region $1B Google's USD 1 billion Thailand plan includes a data center in Chonburi and a cloud region in Bangkok. - Source (news): https://www.nationthailand.com/business/investment/40071418 ## Google data center, Dietzenbach https://datacenters.fru.dev/builds/google-dietzenbach | operator Google | Dietzenbach, Germany | capacity not stated | Announced | announced Nov 11, 2025 | target online 2029 Google will build a new data center in Dietzenbach and keep expanding Hanau as part of a EUR 5.5 billion German investment through 2029. - Source (official): https://www.googlecloudpresscorner.com/2025-11-11-Google-Announces-EUR5-5-Billion-Investment-in-Germany,-including-AI-Infrastructure,-through-2029 ## Google data centers, Finland (Hamina, Kajaani, Muhos, Vaala) https://datacenters.fru.dev/builds/google-finland-2027-2028 | operator Google | Hamina, Finland | capacity not stated | Announced | announced Sep 9, 2026 | target online 2027-2028 Google plans at least EUR 13 billion in Finnish data center and supporting infrastructure in Hamina, Kajaani, Muhos and Vaala over 2027 to 2028. - Source (official): https://www.googlecloudpresscorner.com/2026-09-09-Google-Deepens-Commitment-to-Finland-with-Two-Year-EUR13-Billion-investment-in-AI-Infrastructure ## Google Dorchester County sites and Berkeley County expansion https://datacenters.fru.dev/builds/google-dorchester-county-sc | operator Google | Ridgeville, South Carolina | capacity not stated | Building | announced Oct 13, 2025 | investment $9B through 2027 across Berkeley County expansion and two new Dorchester County sites $9B Google is investing $9 billion in South Carolina to expand its Berkeley County campus and build two new sites in Dorchester County. - Source (official): https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/ ## Google Jackson County campus expansion https://datacenters.fru.dev/builds/google-jackson-county-al-expansion | operator Google | Stevenson, Alabama | capacity not stated | Announced | announced Jun 15, 2026 | investment $1.5B for 2026 and 2027 $1.5B | partners tva Google is spending $1.5 billion to expand its data center campus on a former coal plant site in Jackson County, Alabama. - Source (official): https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/ ## Google St. Ghislain campus expansion https://datacenters.fru.dev/builds/google-st-ghislain-expansion | operator Google | Saint-Ghislain, Belgium | capacity not stated | Announced | announced Oct 8, 2025 | target online 2027 Google will invest EUR 5 billion in 2026 and 2027 to expand its St. Ghislain data center campus in Belgium. - Source (official): https://www.googlecloudpresscorner.com/2025-10-07-Google-Announces-New-EUR5-Billion-AI-Infrastructure-Investment-in-Belgium-through-2027 ## Google Stillwater campus https://datacenters.fru.dev/builds/google-stillwater-ok | operator Google | Stillwater, Oklahoma | capacity not stated | Announced | announced Aug 13, 2025 | investment $9B within two years, covering the new Stillwater campus and expansion at Pryor plus workforce programs $9B Google is investing $9 billion in Oklahoma, including a new data center campus in Stillwater and expansion of its Pryor site. - Source (official): https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-oklahoma/ ## Google Texas campuses https://datacenters.fru.dev/builds/google-texas-campuses | operator Google | Haskell and Armstrong counties, Texas | capacity not stated | Building | announced Nov 14, 2025 | target online 2027 | investment through 2027 $40B Google's $40 billion Texas investment through 2027, including new data center campuses in West Texas. - Source (news): https://www.indystar.com/story/news/local/2026/08/19/google-pledges-6-million-to-texas-towns-affected-by-its-data-centers-abilene/91352544007/ ## Google West Memphis data center https://datacenters.fru.dev/builds/google-west-memphis-ar | operator Google | West Memphis, Arkansas | capacity not stated | Announced | announced Oct 2, 2025 | investment $4B through 2027 $4B | partners Entergy Google plans a $4 billion investment in Arkansas, including its first data center in the state, in West Memphis. - Source (official): https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/ ## Meta Beaver Dam Data Center https://datacenters.fru.dev/builds/meta-beaver-dam-wi | operator Meta | Beaver Dam, Wisconsin | capacity not stated | Building | announced Nov 12, 2025 | investment $1B $1B | partners alliant energy Meta is building a 700,000 square foot AI-optimized data center in Beaver Dam, Wisconsin, a $1 billion investment. - Source (official): https://datacenters.atmeta.com/2025/11/hello-beaver-dam/ ## Meta Eagle Mountain expansion https://datacenters.fru.dev/builds/meta-eagle-mountain-expansion | operator Meta | Eagle Mountain, Utah | capacity not stated | Announced | announced Sep 14, 2026 | investment Total Utah investment raised to more than $3B $3B Meta is expanding its Eagle Mountain, Utah, data center, lifting its total Utah investment to more than $3 billion. - Source (official): https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/ ## Meta Lebanon Data Center https://datacenters.fru.dev/builds/meta-lebanon-in | operator Meta | Lebanon, Indiana | capacity not stated | Announced | announced Feb 11, 2026 | investment More than $10B $10B Meta plans a roughly 4 million square foot data center campus in Lebanon, Indiana, an investment of more than $10 billion. - Source (official): https://datacenters.atmeta.com/2026/02/hello-lebanon/ ## Meta Montgomery Data Center https://datacenters.fru.dev/builds/meta-montgomery-al | operator Meta | Montgomery, Alabama | capacity not stated | Building | announced May 2, 2024 | investment More than $800M at announcement, raised to more than $1.5B with two added buildings in 2025 $1.5B Meta data center in Montgomery, Alabama; a 2025 expansion added two buildings and raised the investment to over $1.5 billion. - Source (official): https://datacenters.atmeta.com/2024/05/hello-montgomery/ - Source (official): https://datacenters.atmeta.com/2025/09/montgomery-were-growing/ ## Meta Tulsa Data Center https://datacenters.fru.dev/builds/meta-tulsa-ok | operator Meta | Tulsa, Oklahoma | capacity not stated | Announced | announced Apr 21, 2026 | investment More than $1B $1B Meta plans an AI data center in Tulsa, Oklahoma, representing more than $1 billion of investment. - Source (official): https://datacenters.atmeta.com/2026/04/hello-tulsa/ ## Microsoft cloud and AI infrastructure, Thailand https://datacenters.fru.dev/builds/microsoft-thailand-2026 | operator Microsoft | Thailand | capacity not stated | Announced | announced Mar 31, 2026 | target online 2028 | investment More than USD 1 billion over 2026 to 2028 $1B Microsoft plans more than USD 1 billion in cloud and AI infrastructure and operations in Thailand from 2026 to 2028. - Source (official): https://news.microsoft.com/source/asia/2026/03/31/microsoft-deepens-thailand-partnership-with-more-than-us1-billion-investment-spanning-technology-trust-and-talent/ ## Microsoft India South Central region, Hyderabad https://datacenters.fru.dev/builds/microsoft-hyderabad-india-south-central | operator Microsoft | Hyderabad, India | capacity not stated | Online | announced Dec 9, 2025 | target online Aug 2026 | investment Part of USD 17.5 billion India investment over 2026 to 2029 $18B Microsoft opened its Hyderabad data center region, its largest in India, as part of a USD 17.5 billion investment in the country over 2026 to 2029. - Source (official): https://news.microsoft.com/source/asia/2025/12/09/microsoft-invests-us17-5-billion-in-india-to-drive-ai-diffusion-at-population-scale/ - Source (news): https://www.rediff.com/business/report/microsoft-hyderabad-data-centre-live-boosting-indias-cloud--ai-infrastructure/20260807.htm ## Microsoft Indonesia Central cloud region https://datacenters.fru.dev/builds/microsoft-indonesia-central | operator Microsoft | Jakarta, Indonesia | capacity not stated | Announced | announced Apr 30, 2024 | investment USD 1.7 billion over four years, including skilling $1.7B Microsoft will invest USD 1.7 billion over four years in new cloud and AI infrastructure in Indonesia. - Source (official): https://news.microsoft.com/apac/2024/04/30/microsoft-announces-us1-7-billion-investment-to-advance-indonesias-cloud-and-ai-ambitions/ ## Microsoft Rhein-Erft data center cluster (Bergheim, Bedburg, Elsdorf) https://datacenters.fru.dev/builds/microsoft-rhein-erft-cluster | operator Microsoft | Bergheim, Germany | capacity not stated | Building Microsoft is building a data center cluster in the Rhenish mining region at Bergheim, Bedburg and Elsdorf as part of a EUR 3.2 billion plan. - Source (news): https://constructionreviewonline.com/microsofts-e3-2b-germany-plan-advances-with-elsdorf-center-announcement/ ## Microsoft Sao Paulo datacenter campuses expansion (unverified) https://datacenters.fru.dev/builds/microsoft-sao-paulo-expansion | operator Microsoft | Sao Paulo, Brazil | capacity not stated | Announced | announced Sep 26, 2024 Microsoft plans BRL 14.7 billion over three years to expand cloud and AI infrastructure across several datacenter campuses in Sao Paulo state. - Source (official): https://news.microsoft.com/pt-br/microsoft-announces-14-7-billion-reais-investment-over-three-years-in-cloud-and-ai-infrastructure-and-provide-ai-training-at-scale/ ## Microsoft Sweden Central expansion (Gavle, Sandviken, Staffanstorp) https://datacenters.fru.dev/builds/microsoft-sweden-expansion | operator Microsoft | Gavle, Sweden | capacity not stated | Announced | announced Jun 3, 2024 | investment SEK 33.7 billion (USD 3.2 billion) $3.2B | chips 20,000 GPUs Microsoft will spend SEK 33.7 billion over two years to expand its Swedish data centers in Gavle, Sandviken and Staffanstorp and add 20,000 GPUs. - Source (news): https://siliconangle.com/2024/06/03/microsoft-details-3-2b-plan-expand-data-center-capacity-sweden/ ## Microsoft West Denmark datacenter region https://datacenters.fru.dev/builds/microsoft-denmark-west | operator Microsoft | Denmark | capacity not stated | Announced | announced Dec 12, 2025 Microsoft plans a second Danish datacenter region in West Denmark, a multi-billion dollar investment beyond 2027. - Source (official): https://news.microsoft.com/source/emea/features/accelerating-europes-digital-future-microsoft-announces-plans-for-a-new-datacenter-region-in-west-denmark/ ## Mistral AI and EcoDataCenter AI data center, Borlange https://datacenters.fru.dev/builds/mistral-ecodatacenter-borlange | operator EcoDataCenter | tenant Mistral AI | Borlange, Sweden | capacity not stated | Announced | announced Feb 11, 2026 | investment EUR 1.2 billion (USD 1.42 billion) $1.42B Mistral AI and EcoDataCenter will invest EUR 1.2 billion in an AI data center at EcoDataCenter's Borlange site, Mistral's first outside France. - Source (news): https://capacityglobal.com/news/mistral-ai-ecodatacenter-partner-ai-data-centre-sweden/ ## Oracle cloud region, Malaysia (unverified) https://datacenters.fru.dev/builds/oracle-malaysia-region | operator Oracle | Malaysia | capacity not stated | Announced | announced Oct 2, 2024 | investment More than USD 6.5 billion $6.5B Oracle plans to invest more than USD 6.5 billion to open a public cloud region in Malaysia. - Source (official): https://www.oracle.com/news/announcement/oracle-to-invest-in-ai-and-cloud-computing-in-malaysia-2024-10-02/ ## Project Jupiter (Stargate New Mexico) https://datacenters.fru.dev/builds/stargate-dona-ana-project-jupiter | operator Oracle | tenant OpenAI | Santa Teresa, Doña Ana County, New Mexico | capacity not stated | Building | announced Sep 23, 2025 | target online 2028 | partners Bloom Energy The Oracle-developed Stargate site near the US-Mexico border. The gas pipeline was refused twice, and in September 2026 Oracle sent a force majeure notice. - 2026-09-24: Oracle sent a force majeure notice over Project Jupiter; the gas pipeline rights-of-way were refused in March and July (https://thenextweb.com/news/oracle-force-majeure-project-jupiter-new-mexico) - Source (official): https://openai.com/index/five-new-stargate-sites/ - Source (news): https://thenextweb.com/news/oracle-force-majeure-project-jupiter-new-mexico ## Project Rainier https://datacenters.fru.dev/builds/aws-project-rainier | operator AWS | tenant Anthropic | New Carlisle, Indiana | capacity not stated | Online | announced Dec 3, 2024 | chips AWS Trainium2 (nearly 500,000) An EC2 UltraCluster of Trainium2 servers built mainly for Anthropic's Claude, fully operational less than a year after it was announced. - Source (official): https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster - Source (news): https://www.businessinsider.com/amazon-agi-pivot-redesigns-ai-data-center-indiana-anthropic-2026-8 ## Proposed AWS Region, Philippines https://datacenters.fru.dev/builds/aws-philippines-region | operator AWS | Philippines | capacity not stated | Announced | announced Jul 8, 2026 | investment Up to USD 5 billion over 15 years (proposed) $5B AWS discussed with President Marcos a proposed Philippine AWS Region that could bring up to USD 5 billion over 15 years. - Source (official): https://www.pna.gov.ph/articles/1278994 ## QTS Cambois campus, former Blyth Power Station https://datacenters.fru.dev/builds/qts-cambois-blyth | operator QTS Data Centers | Cambois, United Kingdom | capacity not stated | Building | partners Blackstone Blackstone's QTS is developing a GBP 10 billion data center campus at the former Blyth Power Station site in Cambois, with phase one approved. - Source (news): https://www.placenortheast.co.uk/qts-doubles-down-as-openai-pauses-north-east-data-centre-ambitions/ ## QTS Hall County campus https://datacenters.fru.dev/builds/qts-lancium-hall-county | operator QTS Data Centers | Turkey, Texas | capacity not stated | Announced | announced Jul 13, 2026 | investment More than $10B expected capital investment $10B | partners Lancium QTS will build and operate data centers on Lancium land near Turkey in Hall County, Texas, with more than $10 billion expected. - Source (official): https://lancium.com/2026/07/13/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/ ## RangeIDC AI data center, Nongsa, Batam https://datacenters.fru.dev/builds/rangeidc-batam-nongsa | operator Range Intelligent Computing Technology | Batam, Indonesia | capacity not stated | Announced | announced Jun 2026 | investment USD 5 billion $5B | partners equator gate system batam China's RangeIDC plans a USD 5 billion AI data center on a 30-hectare site in Nongsa, Batam, built by PT Equator Gate System Batam. - Source (news): https://w.media/china-firm-to-invest-us-5-billion-in-ai-data-center-in-batam/ ## Rubix AI data center, Flix https://datacenters.fru.dev/builds/rubix-flix-catalonia | operator Rubix Data Centers | Flix, Spain | capacity not stated | Announced | announced Jul 2026 | investment More than EUR 1 billion (about USD 1.14 billion) by Submer Group $1.14B | partners submer Submer's Rubix Data Centers plans a more than EUR 1 billion AI data center at an industrial site in Flix, Catalonia. - Source (news): https://w.media/rubix-data-centers-to-develop-us-1-14-billion-ai-data-center-in-catalonia/ ## SK AI Data Center Ulsan https://datacenters.fru.dev/builds/sk-aws-ulsan | operator SK Telecom | tenant AWS | Ulsan, South Korea | capacity not stated | Building | investment KRW 7 trillion (USD 5.2 billion) estimated cost $5.2B | partners SK Group SK Group and AWS are building an AI data center in Ulsan's national industrial complex at an estimated KRW 7 trillion. - Source (news): https://en.yna.co.kr/view/AEN20260910002351320 - Source (official): https://news.sktelecom.com/en/3155 ## Stargate Lordstown https://datacenters.fru.dev/builds/stargate-lordstown | operator SoftBank | tenant OpenAI | Lordstown, Ohio | capacity not stated | Building | announced Sep 23, 2025 | target online 2026 SoftBank's advanced data center design, broken ground in 2025 and due to be operational in 2026; with Milam County it can scale to 1.5 GW. - Source (official): https://openai.com/index/five-new-stargate-sites/ ## Stargate UK https://datacenters.fru.dev/builds/stargate-uk | operator Nscale | tenant OpenAI | Cobalt Park, North Tyneside, United Kingdom | capacity not stated | Paused | announced Sep 16, 2025 | target online Q1 2026 | chips Up to 8,000 NVIDIA GPUs, scaling to 31,000 | partners Nvidia Sovereign compute with Nvidia and Nscale in North East England. OpenAI paused it in April 2026, citing energy costs and regulation. - 2026-04-09: status announced to paused (https://www.datacenterdynamics.com/en/news/openai-drops-out-of-multi-billion-dollar-uk-investment-plan-says-stargate-uk-is-on-hold/) - Source (official): https://openai.com/index/introducing-stargate-uk/ - Source (news): https://www.datacenterdynamics.com/en/news/openai-drops-out-of-multi-billion-dollar-uk-investment-plan-says-stargate-uk-is-on-hold/ ## STT Johor campus, Iskandar Puteri https://datacenters.fru.dev/builds/stt-johor | operator STT GDC | Iskandar Puteri, Malaysia | capacity not stated | Building STT GDC secured USD 1.37 billion of financing to develop STT Johor, its flagship Malaysia campus at Nusa Cemerlang Industrial Park. - Source (news): https://w.media/stt-gdc-secures-usd-1-37-billion-green-financing-for-johor-campus/ ## TikTok data centers, Thailand https://datacenters.fru.dev/builds/tiktok-thailand | operator TikTok | Bangkok, Thailand | capacity not stated | Announced | announced May 6, 2026 | investment THB 842 billion (about USD 25 billion) across three data centers $25B Thailand's Board of Investment approved TikTok data centers in Bangkok, Samut Prakan and Chachoengsao worth about USD 25 billion. - Source (news): https://www.asiatechreview.com/p/tiktok-doubles-down-on-southeast ## Vantage campus, Villanueva de Gallego https://datacenters.fru.dev/builds/vantage-villanueva-de-gallego | operator Vantage Data Centers | Villanueva de Gallego, Spain | capacity not stated | Announced | announced Sep 2025 | investment EUR 3.2 billion (USD 3.78 billion) $3.78B | partners desarrollos ecoindustriales la cartuja Vantage plans a EUR 3.2 billion, five-phase data center campus on 40 hectares in Villanueva de Gallego near Zaragoza. - Source (news): https://bebeez.eu/2025/09/18/vantage-enters-spain-to-invest-e3-2-billion-in-zaragoza-data-center-campus/ ## Wonder Valley data centre park, Greenview (unverified) https://datacenters.fru.dev/builds/wonder-valley-greenview | operator O'Leary Ventures | Municipal District of Greenview, Canada | capacity not stated | Announced Wonder Valley is a proposed CAD 70 billion AI data center park backed by Kevin O'Leary on the Greenview Industrial Gateway in Alberta. - Source (news): https://www.cbc.ca/news/canada/edmonton/industrial-designation-wonder-valley-greenview-9.7331708