
TELUS sovereign AI factory cluster, British Columbia
TELUS · Vancouver, Canada · 150 MW · Building
TELUS plans three sovereign AI data centers in British Columbia, scaling to more than 150 MW by 2032, after its Rimouski AI Factory sold out.
Facts
As of May 12, 2026- Capacity
- 150 MWMore than 150 MW and 60,000 GPUs by 2032 across Kamloops and two Vancouver sites
- Chips
- Nvidia GPUs
- Announced
- May 12, 2026
- Target online
- 2026 to 20292026-2029
- Online
- Building
- Announced
- StoppedPaused or cancelled
Related builds
| Build | Location | Capacity | Status | Target online |
|---|
Bell AI Fabric hub, SaskatchewanBell signed a non-binding MoU with Saskatchewan to add up to 900 MW of Bell AI Fabric capacity toward a 1.2 GW AI hub.Bell Canada · Canada · Announced | Canada | 1.2 GW | Announced | |
Meta Sturgeon County data centerMeta broke ground on a 1 GW AI-optimized data center in Sturgeon County, Alberta, its first in Canada, worth more than CAD 13 billion.Meta · Sturgeon County, Canada · Building | Sturgeon County, Canada | 1 GW | Building | |
Bell AI Fabric supercluster, British ColumbiaBell AI Fabric plans a hydro-powered AI data center supercluster in British Columbia of up to 500 MW across six facilities.Bell Canada · Kamloops, Canada · Announced | Kamloops, Canada | 500 MW | Announced | |
| OLWonder Valley data centre park, GreenviewWonder Valley is a proposed CAD 70 billion AI data center park backed by Kevin O'Leary on the Greenview Industrial Gateway in Alberta.O'Leary Ventures · Municipal District of Greenview, Canada · Announced · unverified | Municipal District of Greenview, Canada | Not stated | Announced | |
Sources and links