Nscale Narvik (was Stargate Norway)

Nscale · Narvik, Norway · 230 MW · Building

Source

Built by Nscale for an Nscale and Aker joint venture on hydropower. OpenAI announced it as Stargate Norway, then did not sign; Microsoft took the capacity.

Facts

As of Apr 15, 2026
Operator
Nscale
Tenant
Microsoft
Partners
Aker, Nvidia
Capacity
230 MWambition to add 290 MW
Chips
NVIDIA Rubin (30,000 for Microsoft)
Power
Hydropower
Location
Narvik, Norway · Cloud regions nearby
Announced
Jul 31, 2025
Target online
2026
Program
Stargate

History

Append-only, newest first
TenantApr 15

openai Microsoft

OpenAI did not conclude an offtake deal; Microsoft takes the capacity

New buildJul 31, 2025

Announced

Related builds

AnnouncedUnverified1.35 GWMonarch Compute CampusNscale bought the Monarch campus in Mason County, West Virginia, and signed a letter of intent to host up to 1.35 GW of Vera Rubin GPUs for Microsoft.Nscale for Microsoft · Point Pleasant, West Virginia · NVIDIA Vera Rubin NVL72Partly onlineTarget 20301.2 GWSINES Data Campus (Start Campus)Start Campus is building a 1.2 GW campus at a former coal plant in Sines, where Nscale deploys over 66,000 Nvidia Rubin GPUs for Microsoft.Start Campus for Microsoft · Sines, Portugal · 12,600+ Nvidia Blackwell Ultra GPUs plus 66,000+ Nvidia Rubin GPUs · $10BPartly onlineTarget 20261.2 GWStargate AbileneThe flagship Stargate campus, built by Crusoe on Lancium's site and run by Oracle for OpenAI: eight buildings, about 1.2 GW.Oracle for OpenAI · Abilene, Texas · NVIDIA GB200 · 3 changesBuildingTarget Oct 15, 20261.2 GWStargate Milam County (Freebird)SB Energy builds and runs the 1.2 GW site; phase one, four data halls in 548,950 sq ft, is filed for completion on October 15, 2026.SB Energy for OpenAI · Milam County, Texas · 1 changePausedTarget May 20261 GWMicrosoft and G42 geothermal data center, OlkariaKenya suspended the USD 1 billion geothermal-powered data center planned with Microsoft and G42 at Olkaria over power needs.G42 for Microsoft · Naivasha, Kenya · $1BBuilding1 GWStargate Michigan (The Barn)Three 550,000 sq ft buildings developed by Related Digital; funding closed in April 2026 and all buildings were under construction by June.Oracle for OpenAI · Saline Township, Michigan · $10B · 1 changeBuildingTarget 20261 GWStargate UAEThe first 1 GW phase of the 5 GW UAE-US AI Campus, built by G42 with OpenAI, Oracle, Nvidia, Cisco and SoftBank. The UAE is now revising the campus into several sites.G42 for OpenAI · Abu Dhabi, United Arab Emirates · NVIDIA GB300 · $30B · 1 changeBuildingTarget 20281 GWStargate Wisconsin (Lighthouse)Four data centers with close to a gigawatt of AI capacity, developed by Vantage with Oracle for OpenAI; completion scheduled for 2028.Vantage Data Centers for OpenAI · Port Washington, Wisconsin · $15B · 1 change