Norway Nscale Narvik (was Stargate Norway) Nscale · Narvik, Norway · 230 MW · Building
Built by Nscale for an Nscale and Aker joint venture on hydropower. OpenAI announced it as Stargate Norway, then did not sign; Microsoft took the capacity.
Facts As of Apr 15, 2026
Capacity 230 MW ambition to add 290 MW
Chips NVIDIA Rubin (30,000 for Microsoft)
Power Hydropower
Announced Jul 31, 2025
Target online 2026
Program Stargate Online Building AnnouncedStopped Paused or cancelled
History Append-only, newest first Tenant Apr 15
openai → Microsoft OpenAI did not conclude an offtake deal; Microsoft takes the capacity
New build Jul 31, 2025
Announced
Related builds Announced Unverified 1.35 GW Monarch Compute Campus Nscale bought the Monarch campus in Mason County, West Virginia, and signed a letter of intent to host up to 1.35 GW of Vera Rubin GPUs for Microsoft. Partly online Target 2030 1.2 GW SINES Data Campus (Start Campus) Start Campus is building a 1.2 GW campus at a former coal plant in Sines, where Nscale deploys over 66,000 Nvidia Rubin GPUs for Microsoft. Partly online Target 2026 1.2 GW Stargate Abilene The flagship Stargate campus, built by Crusoe on Lancium's site and run by Oracle for OpenAI: eight buildings, about 1.2 GW. Building Target Oct 15, 2026 1.2 GW Stargate Milam County (Freebird) SB Energy builds and runs the 1.2 GW site; phase one, four data halls in 548,950 sq ft, is filed for completion on October 15, 2026. Paused Target May 2026 1 GW Microsoft and G42 geothermal data center, Olkaria Kenya suspended the USD 1 billion geothermal-powered data center planned with Microsoft and G42 at Olkaria over power needs. Building 1 GW Stargate Michigan (The Barn) Three 550,000 sq ft buildings developed by Related Digital; funding closed in April 2026 and all buildings were under construction by June. Building Target 2026 1 GW Stargate UAE The first 1 GW phase of the 5 GW UAE-US AI Campus, built by G42 with OpenAI, Oracle, Nvidia, Cisco and SoftBank. The UAE is now revising the campus into several sites. Building Target 2028 1 GW Stargate Wisconsin (Lighthouse) Four data centers with close to a gigawatt of AI capacity, developed by Vantage with Oracle for OpenAI; completion scheduled for 2028. Build Location Capacity Status Target online Monarch Compute Campus Nscale bought the Monarch campus in Mason County, West Virginia, and signed a letter of intent to host up to 1.35 GW of Vera Rubin GPUs for Microsoft. Nscale for Microsoft · Point Pleasant, West Virginia · Announced · unverified Point Pleasant, West Virginia 1.35 GW AnnouncedSINES Data Campus (Start Campus) Start Campus is building a 1.2 GW campus at a former coal plant in Sines, where Nscale deploys over 66,000 Nvidia Rubin GPUs for Microsoft. Start Campus for Microsoft · Sines, Portugal · Partly online · Target 2030 Sines, Portugal 1.2 GW Partly online2030 Stargate Abilene The flagship Stargate campus, built by Crusoe on Lancium's site and run by Oracle for OpenAI: eight buildings, about 1.2 GW. Oracle for OpenAI · Abilene, Texas · Partly online · Target 2026 Abilene, Texas 1.2 GW Partly online3 changes 2026 Stargate Milam County (Freebird) SB Energy builds and runs the 1.2 GW site; phase one, four data halls in 548,950 sq ft, is filed for completion on October 15, 2026. SB Energy for OpenAI · Milam County, Texas · Building · Target Oct 15, 2026 Milam County, Texas 1.2 GW Building1 change Oct 15, 2026 Microsoft and G42 geothermal data center, Olkaria Kenya suspended the USD 1 billion geothermal-powered data center planned with Microsoft and G42 at Olkaria over power needs. G42 for Microsoft · Naivasha, Kenya · Paused · Target May 2026 Naivasha, Kenya 1 GW PausedMay 2026 Stargate Michigan (The Barn) Three 550,000 sq ft buildings developed by Related Digital; funding closed in April 2026 and all buildings were under construction by June. Oracle for OpenAI · Saline Township, Michigan · Building Saline Township, Michigan 1 GW Building1 change Stargate UAE The first 1 GW phase of the 5 GW UAE-US AI Campus, built by G42 with OpenAI, Oracle, Nvidia, Cisco and SoftBank. The UAE is now revising the campus into several sites. G42 for OpenAI · Abu Dhabi, United Arab Emirates · Building · Target 2026 Abu Dhabi, United Arab Emirates 1 GW Building1 change 2026 Stargate Wisconsin (Lighthouse) Four data centers with close to a gigawatt of AI capacity, developed by Vantage with Oracle for OpenAI; completion scheduled for 2028. Vantage Data Centers for OpenAI · Port Washington, Wisconsin · Building · Target 2028 Port Washington, Wisconsin 1 GW Building1 change 2028