AI data center builds

220 builds · 93 gigawatts

SINES Data Campus (Start Campus)

Start Campus · Sines, Portugal · 1.2 GW · Partly online

Source

Start Campus is building a 1.2 GW campus at a former coal plant in Sines, where Nscale deploys over 66,000 Nvidia Rubin GPUs for Microsoft.

Facts

As of Sep 25, 2026
Operator
Start Campus
Tenant
Microsoft
Partners
Nscale, Nvidia
Capacity
1.2 GWFully permitted for 1.2 GW; Nscale adding a second 200 MW building for Microsoft
Chips
12,600+ Nvidia Blackwell Ultra GPUs plus 66,000+ Nvidia Rubin GPUs
Investment
Microsoft announced USD 10 billion for AI infrastructure in Portugal with Nscale and Start Campus; Nscale adding EUR 230 million shared infrastructure and EUR 465 million for a second building $10B
Power
Seawater cooling using former coal plant intake
Location
Sines, Portugal · Cloud regions nearby
Announced
2021
Target online
2030
On file since
Sep 25, 2026 · nscale.com

Related builds

AnnouncedUnverified1.35 GWMonarch Compute CampusNscale bought the Monarch campus in Mason County, West Virginia, and signed a letter of intent to host up to 1.35 GW of Vera Rubin GPUs for Microsoft.Nscale for Microsoft · Point Pleasant, West Virginia · NVIDIA Vera Rubin NVL72PausedTarget May 20261 GWMicrosoft and G42 geothermal data center, OlkariaKenya suspended the USD 1 billion geothermal-powered data center planned with Microsoft and G42 at Olkaria over power needs.G42 for Microsoft · Naivasha, Kenya · $1BAnnounced900 MWCrusoe Abilene expansion for MicrosoftMicrosoft leases 900 MW at Crusoe's Abilene campus, the capacity OpenAI and Oracle chose not to take when they stopped at 1.2 GW.Crusoe for Microsoft · Abilene, TexasPartly online300 MWNebius VinelandDeveloped by DataOne for Nebius to serve its $17 billion Microsoft deal; New Jersey fined it over $1 million in September 2026 for unpermitted gas generators.Nebius for Microsoft · Vineland, New Jersey · 1 changeBuildingTarget Q3 2026240 MWNscale Ward County campusNscale is deploying about 104,000 NVIDIA GB300 GPUs for Microsoft at a roughly 240 MW campus in Ward County, Texas, leased from Ionic Digital.Nscale for Microsoft · Barstow, Texas · About 104,000 NVIDIA GB300; later Vera RubinBuildingTarget 2026230 MWNscale Narvik (was Stargate Norway)Built by Nscale for an Nscale and Aker joint venture on hydropower. OpenAI announced it as Stargate Norway, then did not sign; Microsoft took the capacity.Nscale for Microsoft · Narvik, Norway · NVIDIA Rubin (30,000 for Microsoft) · 1 changePartly onlineTarget 2026200 MWChildress Horizon 1-4IREN is building four liquid-cooled halls at Childress, Texas, to host NVIDIA GB300 GPUs for Microsoft under a $9.7 billion contract.IREN for Microsoft · Childress, Texas · NVIDIA GB300 · $5.8BAnnouncedTarget 2026200 MWMicrosoft and G42 200 MW expansion via Khazna, UAEMicrosoft and G42 are adding 200 MW of data center capacity in the UAE through Khazna, starting to come online before end 2026.Khazna Data Centers for Microsoft · Abu Dhabi, United Arab Emirates