MGX, Bpifrance, Mistral AI and Nvidia AI campus, Paris regionA joint venture of MGX, Bpifrance, Mistral AI and Nvidia plans Europe's largest AI campus in the Paris region, scaling to 1.4 GW.Partner, run by MGX · France · Announced | France | 1.4 GW | Announced | |
Monarch Compute CampusNscale bought the Monarch campus in Mason County, West Virginia, and signed a letter of intent to host up to 1.35 GW of Vera Rubin GPUs for Microsoft.Partner, run by Nscale · Point Pleasant, West Virginia · Announced · unverified | Point Pleasant, West Virginia | 1.35 GW | Announced | |
SINES Data Campus (Start Campus)Start Campus is building a 1.2 GW campus at a former coal plant in Sines, where Nscale deploys over 66,000 Nvidia Rubin GPUs for Microsoft.Partner, run by Start Campus · Sines, Portugal · Partly online · Target 2030 | Sines, Portugal | 1.2 GW | Partly online | 2030 |
Stargate AbileneThe flagship Stargate campus, built by Crusoe on Lancium's site and run by Oracle for OpenAI: eight buildings, about 1.2 GW.Partner, run by Oracle · Abilene, Texas · Partly online · Target 2026 | Abilene, Texas | 1.2 GW | Partly online3 changes | 2026 |
Data Center Valley, EkibastuzThe USD 10 billion Data Center Valley in Ekibastuz, Kazakhstan, backed by Nvidia and Firebird, is planned to scale to 1 GW.Partner, run by Firebird · Ekibastuz, Kazakhstan · Building · Target Jun 2027 | Ekibastuz, Kazakhstan | 1 GW | Building | Jun 2027 |
Stargate UAEThe first 1 GW phase of the 5 GW UAE-US AI Campus, built by G42 with OpenAI, Oracle, Nvidia, Cisco and SoftBank. The UAE is now revising the campus into several sites.Partner, run by G42 · Abu Dhabi, United Arab Emirates · Building · Target 2026 | Abu Dhabi, United Arab Emirates | 1 GW | Building1 change | 2026 |
Zankore by Indosat AI factory platformIndosat, Ooredoo, Nokia and Nvidia launched Zankore, targeting 1 GW of Nvidia AI factory capacity in Indonesia.Partner, run by Indosat Ooredoo Hutchison · Indonesia · Announced | Indonesia | 1 GW | Announced | |
Colossus 2Operational from September 3, 2026 at about 946 MW of IT power, by Epoch AI's count the largest AI data center.Partner, run by SpaceXAI · Memphis, Tennessee · Online · Target 2027 | Memphis, Tennessee | 946 MW | Online1 change | 2027 |
xAI and HUMAIN data center, Saudi ArabiaHUMAIN and xAI plan a 500 MW data center in Saudi Arabia powered by Nvidia chips.Partner, run by HUMAIN · Saudi Arabia · Announced · unverified | Saudi Arabia | 500 MW | Announced | |
DayOne and Firmus AI campus, Kabil, BatamDayOne and Firmus are developing a 360 MW AI campus in Batam, with access to up to 170,000 Nvidia accelerators.Partner, run by DayOne · Batam, Indonesia · Announced | Batam, Indonesia | 360 MW | Announced | |
Firebird AI factory, ArmeniaFirebird launched an Nvidia AI factory in Armenia and plans 300 MW and more than 70,000 GPUs there by end 2027.Partner, run by Firebird · Armenia · Partly online · Target 2027 | Armenia | 300 MW | Partly online | 2027 |
Denton HPC campusCore Scientific is converting its Denton, Texas, site into a roughly 260 MW GPU data center leased to CoreWeave.Partner, run by Core Scientific · Denton, Texas · Partly online | Denton, Texas | 260 MW | Partly online | |
Nscale Ward County campusNscale is deploying about 104,000 NVIDIA GB300 GPUs for Microsoft at a roughly 240 MW campus in Ward County, Texas, leased from Ionic Digital.Partner, run by Nscale · Barstow, Texas · Building · Target Q3 2026 | Barstow, Texas | 240 MW | Building | Q3 2026 |
Nscale Narvik (was Stargate Norway)Built by Nscale for an Nscale and Aker joint venture on hydropower. OpenAI announced it as Stargate Norway, then did not sign; Microsoft took the capacity.Partner, run by Nscale · Narvik, Norway · Building · Target 2026 | Narvik, Norway | 230 MW | Building1 change | 2026 |
Childress Horizon 1-4IREN is building four liquid-cooled halls at Childress, Texas, to host NVIDIA GB300 GPUs for Microsoft under a $9.7 billion contract.Partner, run by IREN · Childress, Texas · Partly online · Target 2026 | Childress, Texas | 200 MW | Partly online | 2026 |
Egypt AI data center (Vodafone, Elsewedy, Cassava)Egypt plans a 200 MW, USD 1 billion AI data center with Nvidia technology, starting with a 20 MW phase by Vodafone, Elsewedy and Cassava.Partner, run by Cassava Technologies · Egypt · Announced · unverified | Egypt | 200 MW | Announced | |
NAVER GAK Sejong AI factoryNAVER plans to grow its Nvidia AI factory at GAK Sejong from 55 MW to 200 MW by 2028, with Brookfield financing up to USD 9 billion.Partner, run by NAVER · Sejong, South Korea · Announced · Target 2028 | Sejong, South Korea | 200 MW | Announced | 2028 |
Tydal Data Center, NorwayBitdeer signed a USD 4.7 billion lease with Volta for 121 MW of IT capacity at its Tydal facility in Norway for a leading AI lab.Partner, run by Bitdeer · Tydal, Norway · Announced | Tydal, Norway | 121 MW | Announced | |
Foxconn and Nvidia AI factory, KaohsiungFoxconn and Nvidia plan an AI data center in Taiwan targeted at 100 MW, built in phases with some in Kaohsiung.Partner, run by Foxconn · Kaohsiung, Taiwan · Announced | Kaohsiung, Taiwan | 100 MW | Announced | |
Nscale AI Campus, Loughton (Microsoft)Nscale is building a GBP 2 billion AI campus in Loughton with Microsoft as anchor tenant, 50 MW scalable to 90 MW, though grid power is delayed.Partner, run by Nscale · Loughton, United Kingdom · Building · Target Q1 2027 | Loughton, United Kingdom | 90 MW | Building | Q1 2027 |
Nexus AI Factory, MoroccoNexus Core Systems signed an MoU to invest MAD 12 billion in a two-phase AI factory in Morocco, starting in Nouaceur.Partner, run by Nexus Core Systems · Nouaceur, Morocco · Announced · Target 2027 | Nouaceur, Morocco | 36 MW | Announced | 2027 |
Deutsche Telekom and Nvidia Industrial AI Cloud, MunichDeutsche Telekom and Nvidia set up a EUR 1 billion AI factory in Munich with up to 10,000 Blackwell GPUs for German industry.Partner, run by Deutsche Telekom · Munich, Germany · Announced · Target Early 2026 | Munich, Germany | Not stated | Announced | Early 2026 |
Fairwater AtlantaThe second Fairwater site, linked to Wisconsin over Microsoft's AI WAN so one training job can span both.Partner, run by Microsoft · Atlanta, Georgia · Online | Atlanta, Georgia | Not stated | Online | |
Fairwater WisconsinThree buildings on 315 acres run as one supercomputer; fully operational in June 2026, with a second facility under construction next door.Partner, run by Microsoft · Mount Pleasant, Wisconsin · Online · Target 2026 | Mount Pleasant, Wisconsin | Not stated | Online2 changes | 2026 |
Stargate UKSovereign compute with Nvidia and Nscale in North East England. OpenAI paused it in April 2026, citing energy costs and regulation.Partner, run by Nscale · Cobalt Park, North Tyneside, United Kingdom · Paused · Target Q1 2026 | Cobalt Park, North Tyneside, United Kingdom | Not stated | Paused1 change | Q1 2026 |